My WebLink
|
Help
|
About
|
Sign Out
04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2013
>
091713
>
04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2013 12:21:13 PM
Creation date
9/12/2013 3:20:38 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/17/2013
DESTRUCT DATE
15Y
DOCUMENT NO
04
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
storage including any modifications of the existing outfall to allow sufficient capacity for <br />storm water treatment and hydro- modification. <br />102. Each apartment unit shall be sub - metered for sewer and /or water billing purposes. The <br />locations of the water meters and the water and sewer mains to these buildings shall be <br />shown on the plans submitted to the City Engineer and the Building and Safety Division <br />-for plan check, and shall be subject to the review and approval of the Director of <br />Community Development prior to the approval of the improvement plans and the issuance <br />of building permits. <br />103. Streets A, B, C, and D, shown on the PUD Development Plan shall be public and shall be <br />maintained by the City of Pleasanton including street lights and utilities such as water, <br />:sewer, and storm drain lines. <br />104. Courts A thru U shall be private and shall be maintained by the homeowners association <br />including all underground utilities and street lights. <br />105. 'The decorative paving installed in the public rights -of -way, such as pavers or stamped <br />pavement within the intersections and crosswalks, shall be the responsibility of the <br />homeowner's association. This includes general maintenance or pavement replacement <br />,due normal wear or to any utility work conducted within the roadway by the City of <br />Pleasanton. <br />106. 'The 8 -inch sanitary sewer main located on Court I and Lot C shall be public and <br />maintained by the City of Pleasanton. A drivable surface with H -20 loading shall be <br />constructed at the end of Courts I and K for maintenance vehicles to access the sanitary <br />sewer manholes on the 8 -inch sanitary sewer main within Court I and Lot C. The design <br />-and materials shall be approved by the City Engineer before construction begins. <br />107. 'The existing 48 -inch storm drain line running east to west located on the south portion of <br />this development shall be relocated within Street A. The final location shall be approved <br />by the City Engineer. <br />108. A drivable surface with H -20 loading shall be constructed from Street A westerly on Lot B <br />to allow for maintenance vehicles to access the existing storm drain manholes on the 48- <br />iinch storm drain line. The design and materials shall be approved by the City Engineer. <br />109. All existing water, sewer, and storm utility lines stubbed to site along Valley Avenue, that <br />are not used by this development shall be abandoned to the satisfaction of the City <br />Engineer. <br />STANDARD CONDITIONS OF APPROVAL <br />Engineering <br />110. A "Conditions of Approval" checklist shall be completed and attached to all plan checks <br />;submitted for approval indicating that all conditions have been satisfied. <br />111. 'The project applicant/developer shall grant an easement to the City over those portions of <br />'the parcel needed for public service easements (P.S.E.) and which are approved by the <br />City Engineer, or other easements, which may be designated by the City Engineer. <br />Page 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.