My WebLink
|
Help
|
About
|
Sign Out
04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2013
>
091713
>
04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2013 12:21:13 PM
Creation date
9/12/2013 3:20:38 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/17/2013
DESTRUCT DATE
15Y
DOCUMENT NO
04
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPECIAL CONDITIONS OF APPROVAL <br />Engineering <br />97. The project applicant/developer shall install a minimum five -foot wide separated concrete <br />sidewalk along the Valley Avenue frontage from the project's shared access driveway with <br />the Pleasanton Gateway shopping center to the traffic circle below the southernmost <br />project boundary line. The planter strip between the back of curb and face of sidewalk <br />shall be a minimum of five feet. If the project applicant/developer installs a City standard <br />sidewalk along the project frontage and dedicates an easement for the maintenance of the <br />sidewalk, the City will accept the sidewalk for maintenance, however it the sidewalk is not <br />in conformance with City standard the sidewalk shall be privately maintained by the <br />project maintenance association. All landscaping and irrigation lines within the planter <br />strip shall be maintained by the homeowners association. <br />98. The project developer shall include erosion control measures, prepared and signed by the <br />Qualified Storm Water Pollution Prevention Plan Developer (QSD), on the final grading <br />plan, subject to the review of the City Engineer. This erosion control measures shall be as <br />required by the state's Construction General Permit. The project developer is responsible <br />for ensuring that the contractor is aware of such measures. All cut and fill slopes shall be <br />re- vegetated and stabilized as soon as possible after completion of grading, in no case <br />later than October 15. No grading shall occur between October 15 and April 15 unless <br />approved erosion control measures are in place, subject to the approval of the project <br />QSD and the City Engineer. Such measures shall be maintained until such time as a <br />permanent landscaping is in place, site is stabilized and Notice of Completion (NOC) has <br />been filed with the State Regional Water Board and /or accepted by City. <br />99. The project applicant/developer shall install trash capture devices within the project's <br />storm drain inlets or storm drain piping to capture trash within the development. These <br />devices shall trap particles of 5mm or greater and have treatment capacity not less than <br />the peak storm from a "one year, one hour' event within the drainage area. The project <br />applicant's or developer's engineer shall submit calculations and product submittals to the <br />City Engineer for review and approval prior to the issuance of a grading or building permit, <br />whichever is sooner. <br />100. A detailed grading and drainage plan prepared by a licensed Civil Engineer including all <br />supporting information and design criteria, storm drain treatment calculations, and hydro - <br />modification worksheets, etc., shall be submitted with the improvement plans to the <br />satisfaction of the Coty Engineer. The calculations shall demonstrate to the satisfaction of <br />the City Engineer that there is sufficient capacity within the existing Central Detention <br />Pond on the Bernal Property to allow for both hydro- modification and storm water <br />treatment for existing residential developments, both existing and future development of <br />Bernal Parks, the Pleasanton Gateway shopping center development, and the subject <br />residential development. Prior to the first plan check, the project applicant/developer's <br />engineer shall submit the storm drain drawings and hydro - modification calculations to the <br />City Engineer for review. The hydro- modification calculations shall be peer reviewed by <br />the City's consultant, with the peer review costs paid for by the project applicant/ <br />developer subject to the peer review procedures established by the City Engineer. <br />101. Based upon the storm drainage analysis required in the condition above, subject to the <br />review and approval by the City Engineer, the project applicant/developer shall be <br />responsible for making any modification to the existing detention pond for any additional <br />Page 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.