Laserfiche WebLink
2. Title 24 Energy Code Surcharge. A 25% surcharge fee to both the permit and plan review S <br /> assessed on all budding areas containing space subject to the provisions of the California <br /> Energy Code. <br /> 3 Disabled Access Surcharge. This 15% surcharge to the Building Permit Fee Is assessed to <br /> all permits for projects which are required to be accessible, public buildings, commercial and <br /> multi-family residential buildings. <br /> 4. Sub-Trades: Electrical, Plumbing and Mechanical Permit Fees. Stand atone electrical, <br /> mechanical or plumbing (sub-trades) permit fees are assessed on a per Rem basis. as shown <br /> on pages 8-10 Sub-trade fees for all new residential construction are assessed on a cost per <br /> square foot basis. All building permits with associated sub-trades are assessed a single sub- <br /> trade permit fee. 25% of the building permit fee. covering all electrical, mechanical and/or <br /> plumbing work <br /> 5. Plan Review Fees. Plan review fees are collected for all applicable plan reviews that apply to <br /> any given project. Fees for the Initial plan review of buildings, structures and fire sprinkler <br /> systems are a percentage of the Building Permit Fee that was calculated in step number 1 <br /> above. Fees for revisions to previously approved plans are based upon the time needed for <br /> review at the current rate of the reviewer, with a minimum charge of one hour plus <br /> administrative charges. <br /> Note: A fast-track plan review is swami* for most reviews. Please contact the Building Division for <br /> specific details_ <br /> Building Code plan review:65%of the Building Permit fee, $98.48 minimum. <br /> Sub-Trades plan review. 25% of the Building Code plan review fee. <br /> Fire Department Life Safety/Egress plan review:25% of the Building Permit fee. <br /> Green Building plan review(projects subject to Green Building Standards), $295.44 minimum <br /> 6. Fire Sprinkler Plan Check and Permit Fee. Fire Sprinkler plan review and permit fees are paid <br /> at the time of submittal in the Permit Center. These fees are based on the cost of the sprinkler <br /> system for new construction and alteration, and are calculated in the same manner as Items 1 & <br /> 5 above, but use a valuation factor of$4A5 per square foot. The minimum plan check fee is <br /> $98.48. based upon the current plan review rate of our consultants. <br /> Note: The contract price is used for valuation to determine plan check and permit fees for small <br /> alterations to existing system where fewer then five heeds are added or relocated. <br /> 7 Fire Alarm Plan Check and Permit Fee. The minimum tee for fire alarm system installations <br /> and alterations is $275.00, collected at the time of submittal for plan review. The Fire Alarm <br /> Permit fee is based on the number of hours the Fire Department estimates the field inspection <br /> time will entail, plus administrative and archiving fees. <br /> 8 Hazardous Materials Plan Check and Permit Me. The initial plan submittal fee for the review <br /> and inspection of hazardous material installations is $420.00 The Hazardous Materials Permit <br /> fee Is based on the Fire Department estimate of field inspection time, plus administrative & <br /> archiving fees. <br /> 9 On-Site Pam'its. On-Site permits are required for improvements outside of structures on <br /> private property such as curb & gutter, sidewalk, pavement, underground piping, site lighting, <br /> erosion control. etc. The plan review fee is 0.6% of the estimated value of the improvements, <br /> and the onsite permit fee is 1.4%of the estimated value of the improvements. <br /> Page 2 of 10 <br /> •s.,. , 7 ill- . <br /> Error! Unknown document property name. 26 <br />