My WebLink
|
Help
|
About
|
Sign Out
ORD 2076
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
2001 - 2100
>
ORD 2076
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:22:02 PM
Creation date
9/4/2013 1:02:36 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
8/20/2013
DESTRUCT DATE
PERMANENT
DOCUMENT NO
ORD 2076
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'"rtrrr°` BUILDING PERMIT AND <br /> PL'EASANTON DEVELOPMENT FEES <br /> July 1,2013 <br /> Many complex fees have been presented in a simplified form to assist the estimator. The values <br /> shown in this document reflect the fee rates in effect at the time of publication and are subject to <br /> change without notification. Actual fee amounts are calculated by the Permit Center staff for <br /> every permit The values shown in this document are for estimatina outvotes onfv. <br /> Plan Review fees are due at time of application submittal; building permit and impact fees are <br /> due at the time of permit issuance. Building Permit Fees are based upon the building permit fee <br /> schedule in effect at the time of permit application_ Development Fees are based upon the <br /> applicable rate in effect at the time of payment at permit issuance, not application date and are <br /> only applicable on newly constructed buildings, additions or on a change of use in an existing <br /> building. Pre-payment of budding permit fees or impact fees before issuance is not permitted. <br /> Project valuation is the basis of all building permit and plan review fees Alterations, Remodels <br /> and Tenant Improvements use the contract price for the work as the valuation, but new project <br /> valuation is determined from our valuation table. See a pats/table below for a sample of some <br /> common project types. For uses not shown please contact the Building and Safety Division. <br /> Use Occupancy Group Construction Type Rate(per Sq Ft) <br /> Single Family Dwelling R-3 VB $131.30 <br /> Private Garage U VB $47.44 <br /> Apartment Building R-2 VB $117 30 <br /> Warehouse,uncondtioned S-1 IIIB $81.99 <br /> Office Bulking B VB $150.89 <br /> Retail Store hi VS $113.72 <br /> Restaurant A-2 VA $147.85 <br /> 1 Budding Permit Fee. Once a valuation has been Example:A new 2,500 s$dwelling with a <br /> determined for a project, the Building Permit Fee can be 650 sr garage: <br /> calculated based on the Fee Table shown below. Many <br /> subsequent fees and charges are based on a percentage First,calculate the total valuation <br /> of this base fee. 2500x 3131.301st; 3328250.00 dwelling <br /> 650 x$47.441st: +$30835.00 garage <br /> Total Valuation Base Fee Rate per each Totalvaluati:n 5359,086.00 <br /> Unit above Base <br /> $1 to$500 $23.50 Then, calculate fees <br /> $501 to$2,000 $23.50 $3.05 $100" Mang Permit tee,based on 5369,086.00: <br /> K <br /> p [$993.75+(260'x$5.60)1= $2449.75 <br /> $2001 to 325,000 $69.28 $14.00 per s1,000" T-24 Energy Surcharge,- <br /> 25%'$2449.75 - $612.44 <br /> $25,001 to$50,000 $391.25 $10.10 per 31,000" Bteldng Plan Rwlewfee, <br /> $50,001 to$100,000 $643.75 $7.00 per$1,000' 65%.$2,449.75 = $1.502.34 <br /> 1-24 Energy Plan Review lee <br /> .y 5100,001 to$5011000 $993.75 $5.60 per$1.000" 25%'5612.44 = $153.11 <br /> $500,001 to 31.000 000 $3,233.75 $4.75 per$1,000' <br /> $1,000.001 and over $5.608.76 $3.65 per 31,000" a.(359A Ba00-Wet o0911talo=259.09• use 200 <br /> 'or Nucleon thereof over initial Wu amount <br /> ,Paae 1 of 10 <br /> Error! Unknown document property name. 25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.