Laserfiche WebLink
on a daily basis. Scrape caked on mud and dirt from these areas <br /> before sweeping. <br /> 5. Install filter materials (such as sandbags, filter fabric, etc.) at the storm <br /> drain inlet nearest the downstream side of the project site in order to <br /> retain any debris or dirt flowing in the storm drain system. Maintain <br /> and/or replace filter materials to ensure effectiveness and to prevent <br /> street flooding. <br /> 6. Create a contained and covered area on the site for the storage of <br /> cement, paints, oils, fertilizers, pesticides, or other materials used on <br /> the site that have the potential of being discharged into the storm drain <br /> system by being windblown or by being spilled. <br /> 7. Never clean machinery, equipment, tools, brushes, or rinse containers <br /> into a street, gutter, or storm drain. <br /> 8. Ensure that concrete/gunite supply trucks or concrete/plaster <br /> operations do not discharge wash water into a street, gutter, or storm <br /> drain. <br /> 9. Equipment fueling area (if used at the construction site): use a <br /> designated area away from the storm drainage facility; use secondary <br /> containment and spill rags when fueling; discourage "topping off' of <br /> fuel tanks; place a stockpile of absorbent material where it will be <br /> readily accessible; check vehicles and equipment regularly for leaking <br /> oils and fuels; and dispose of rags and absorbent materials promptly <br /> and properly. Use of an off-site fueling station is strongly encouraged. <br /> 10.Concrete wash area: 1) locate wash out area away from storm drains <br /> and open ditches; 2) construct a temporary pit large enough to store <br /> the liquid and solid waste; 3) clean the pit by allowing concrete to set; <br /> 4) break up the concrete; and then 5) recycle or dispose of properly. <br /> 11.Equipment and vehicle maintenance area at the project site is not <br /> permitted; use an off-site repair shop. <br /> b. Within 30 days of the installation and testing of the stormwater treatment and <br /> hydromodification facilities, the designer of the site shall submit a letter to City <br /> Project Inspector/Construction Services Manager certifying the devices have <br /> been constructed in accordance with the approved plans for stormwater and <br /> C3 design for the project. The letter shall request an inspection by City staff. <br /> Operation and Maintenance Requirements <br /> 149. The project shall comply with the operation and maintenance requirements of the <br /> NPDES Permit. All regulated projects (such as a residential subdivision projects) <br /> 13-Unit)Development Plan Ponderosa Homes <br /> PUD-97, Conditions of Approval 31 of 32 4202 Stanley Boulevard <br />