My WebLink
|
Help
|
About
|
Sign Out
10
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2013
>
090313
>
10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2013 12:16:54 PM
Creation date
8/29/2013 12:16:48 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/3/2013
DESTRUCT DATE
15Y
DOCUMENT NO
10
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
installation of the BMPs, thorough and frequent inspections, maintenance, <br /> and documentations. SWPPP for projects shall be kept up to date with <br /> the projects' progress. Failure to comply with the most updated <br /> construction SWPPP may result in the issuance of correction notices, <br /> citations, and/ or stop work orders. <br /> iii. The project developer is responsible for implementing the following Best <br /> Management Practices (BMPs). These, as well as any other applicable <br /> measures, shall be included in the SWPPP and implemented as approved <br /> by City. <br /> 1. The project developer shall include erosion control/stormwater quality <br /> measures on the project grading plan which shall specifically address <br /> measures to prevent soil, dirt, and debris from entering the public <br /> storm drain system. Such measures may include, but are not limited <br /> to, hydroseeding, hay bales, sandbags, and siltation fences and shall <br /> be subject to the review and approval of the City Engineer/Chief <br /> Building Official. If no grading plan is required, necessary erosion <br /> control/stormwater quality measures shall be shown on the site plan <br /> submitted for a building permit, and shall be subject to the review and <br /> approval of the Building and Safety Division. The project developer is <br /> responsible for ensuring that the contractor is aware of and implements <br /> such measures. <br /> 2. All cut and fill slopes shall be revegetated and stabilized after <br /> completion of grading, but in no case later than October 15. <br /> Hydroseeding shall be accomplished before September 15 and <br /> irrigated with a temporary irrigation system to ensure that the <br /> vegetated areas are established before October 15. No grading shall <br /> occur between October 15 and April 15 unless approved erosion <br /> control/stormwater quality measures are in place, subject to the <br /> approval of City Engineer/Chief Building Official. Such measures shall <br /> be maintained until such time as permanent landscaping is in place. <br /> 3. Gather all sorted construction debris on a regular basis and place in <br /> the appropriate container for recycling; to be emptied at least on a <br /> weekly basis. When appropriate, use tarps on the ground to collect <br /> fallen debris or splatters that could contribute to stormwater runoff <br /> pollution. <br /> 4. Remove all dirt, gravel, rubbish, refuse, and green waste from the <br /> street pavement and storm drains adjoining the site. Limit construction <br /> access routes onto the site and place gravel on them. Do not drive <br /> vehicles and equipment off paved or graveled areas during wet <br /> weather. Broom sweep the street pavement adjoining the project site <br /> 13-Unit'Development Plan Ponderosa Homes <br /> PUD-97, Conditions of Approval 30 of 32 4202 Stanley Boulevard <br />
The URL can be used to link to this page
Your browser does not support the video tag.