Laserfiche WebLink
of a grading or building permit, whichever is sooner. The structural control <br /> shall be cleaned at least twice a year (once immediately prior to October 15 <br /> and once in January). <br /> c. The project developer shall submit to the City Engineer the sizing design <br /> criteria and calculations for a hydromodification facility, if required, and for the <br /> treatment of stormwater runoff. The design criteria and calculations shall be <br /> subject to the review and approval of the City Engineer and shall be <br /> submitted prior to the issuance of a grading or building permit, whichever is <br /> sooner. <br /> d. Building/Structures shall be designed to minimize the occurrence and entry of <br /> pests into buildings, thus minimizing the need for pesticides, as determined <br /> by the Chief Building Official prior to the issuance of a building permit. <br /> e. The project's landscape and irrigation plans shall be designed to: 1) minimize <br /> the use of fertilizers and pesticides that can contribute to stormwater pollution; <br /> and 2) promote surface infiltration. Prior to the installation of project <br /> landscaping and irrigation, the project landscape architect shall submit a <br /> landscaping and irrigation plan to the City Engineer for review and approval <br /> and submit written verification stating the project incorporates the following: <br /> i. Plants tolerant of saturated soil conditions and prolonged exposure to <br /> water in areas that provide detention of water. <br /> ii. Plants and soil amendments appropriate to site specific characteristics <br /> such as topography and climate. <br /> iii. Landscaping and irrigation consistent with Bay-Friendly Landscaping. <br /> iv. Water conservation techniques to promote surface infiltration. <br /> f. All metal roofs, gutters, and downspouts shall be finished with rust-inhibitive <br /> finish/paint as determined by the Chief Building Official. <br /> g. All projects using architectural copper roofing, gutters, downspouts, etc., shall <br /> utilize the following Best Management Practices for use and maintenance: <br /> i. During installation, copper material shall be pre-patinated at the factory. If <br /> patination is done on-site; collect the rinse water in a tank and haul off-site <br /> for disposal. With prior authorization from Dublin San Ramon Services <br /> District (DSRSD), you may collect the rinse water in a tank and discharge <br /> to the sanitary sewer. Optionally, consider coating the copper materials <br /> with a clear coating that prevents further corrosion and stormwater <br /> pollution. The clear coating, if utilized, shall be reapplied (as <br /> recommended by the coating manufacturer) to maintain its efficacy. <br /> 13-Uniti Development Plan Ponderosa Homes <br /> PUD-97, Conditions of Approval 28 of 32 4202 Stanley Boulevard <br />