My WebLink
|
Help
|
About
|
Sign Out
09
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2013
>
090313
>
09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2013 12:09:59 PM
Creation date
8/29/2013 12:09:54 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/3/2013
DESTRUCT DATE
15Y
DOCUMENT NO
09
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Huy A. Ho, P.E. <br /> The City of Pleasanton <br /> August 13, 2013 <br /> Page 4 <br /> COLLECTION SYSTEM DESIGN ASSUMPTIONS: <br /> • The City has conducted a CCTV video inspection of the EARS pipeline End the City has <br /> identified the "hot spots"; Carollo's review of the collection system T-Lok liner condition <br /> will focus on the hot spots only. <br /> • Snapshots of the CCTV video inspection will be added to the specificatic ns as an <br /> appendix. <br /> • The EARS and EATS trunk sewers will be connected at the following seven locations: <br /> o The four existing drop manhole structures located at Hopyard and Stoneridge, <br /> near the Chabot Canal and Stoneridge, Willow and Stoneridge, and Hacienda <br /> and Stoneridge. <br /> o The existing connection pipeline located near Stoneridge Road aid the Arroyo <br /> Mocho canal. <br /> o The existing manhole located near Santa Rita Road and Stonericge Drive. <br /> o We will design a new manhole at the intersection of Hopyard and Stoneridge <br /> Drive to connect the existing 18-inch sewer pipeline to the EARS pipeline. Note <br /> the 18-inch pipeline connects to the EATS. <br /> • Carollo assumes repair of the T-Lok liner within the existing manholes are simplistic and <br /> will be completed from the inside of the manhole. <br /> • The EARS pipeline repair work can be accomplished with a standard point repair and <br /> ceiling of the T-Lok joints and detailed design is not necessary. <br /> Refer to Figure #1 for an overview of the project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.