My WebLink
|
Help
|
About
|
Sign Out
09
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2013
>
090313
>
09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2013 12:09:59 PM
Creation date
8/29/2013 12:09:54 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/3/2013
DESTRUCT DATE
15Y
DOCUMENT NO
09
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Huy A. Ho, P.E. <br /> The City of Pleasanton <br /> August 13, 2013 <br /> Page 10 <br /> 5.0 Existing EARS Pipeline Condition Evaluation <br /> This task is new and includes services to evaluate the EARS pipeline condition, provide an <br /> evaluation memorandum, and provide final plans, specifications, and cost estimate for the <br /> collection system upgrades. <br /> 5.1 Evaluate EARS Pipeline Condition. Under this task, Carollo will evaluate the <br /> existing condition of the T-Lock lining of the EARS pipeline in the "hot spot" <br /> locations identified by the City. <br /> 5.2 Provide EARS Evaluation Summary Table. A summary table will be provided to <br /> summarize findings for the EARS pipeline condition evaluation. A listing of <br /> material defects and potential rehabilitation requirements for the existing T-Lock <br /> lining will be included. <br /> Deliverables: <br /> • EARS Condition Evaluation Summary Table <br /> 5.3 Collection System Final Plans, Specifications, and Cost Estimate: Carollo will <br /> prepare the necessary specifications and CAD drawings for the collection system <br /> improvements project. The deliverables will be delivered as described in Task 3.2; <br /> this work includes: <br /> • EARS pipeline repair strategy. <br /> • Design of repairs to the EARS pipeline T-lock liner. <br /> • Design of a new manhole to connect EATS/EARS pipelines at the <br /> intersection of Hopyard and Stoneridge. <br /> • Modification of the existing manholes (5) to connect the EATS/EARS <br /> pipelines. <br /> 6.0 Optional Tasks <br /> This task includes optional services to provide air permitting, noise attenuation assistance, and <br /> design of a standby diesel generator. <br /> 6.1 BAAQMD Permitting: Mizutani Environmental, a subconsultant to Carollo, will <br /> provide assistance to City with the preparation of documentation r ecessary for the <br /> successful submission of air permit application if a new standby generator is <br /> required. Mizutani environmental will also assist the City with responses to <br /> comments generated during the review period until the permit is approved. <br /> The estimated cost of Optional Task 6.1 is $4,356. <br />
The URL can be used to link to this page
Your browser does not support the video tag.