Laserfiche WebLink
Mr. Huy A. Ho, P.E. <br /> The City of Pleasanton <br /> August 13, 2013 <br /> Page 10 <br /> 5.0 Existing EARS Pipeline Condition Evaluation <br /> This task is new and includes services to evaluate the EARS pipeline condition, provide an <br /> evaluation memorandum, and provide final plans, specifications, and cost estimate for the <br /> collection system upgrades. <br /> 5.1 Evaluate EARS Pipeline Condition. Under this task, Carollo will evaluate the <br /> existing condition of the T-Lock lining of the EARS pipeline in the "hot spot" <br /> locations identified by the City. <br /> 5.2 Provide EARS Evaluation Summary Table. A summary table will be provided to <br /> summarize findings for the EARS pipeline condition evaluation. A listing of <br /> material defects and potential rehabilitation requirements for the existing T-Lock <br /> lining will be included. <br /> Deliverables: <br /> • EARS Condition Evaluation Summary Table <br /> 5.3 Collection System Final Plans, Specifications, and Cost Estimate: Carollo will <br /> prepare the necessary specifications and CAD drawings for the collection system <br /> improvements project. The deliverables will be delivered as described in Task 3.2; <br /> this work includes: <br /> • EARS pipeline repair strategy. <br /> • Design of repairs to the EARS pipeline T-lock liner. <br /> • Design of a new manhole to connect EATS/EARS pipelines at the <br /> intersection of Hopyard and Stoneridge. <br /> • Modification of the existing manholes (5) to connect the EATS/EARS <br /> pipelines. <br /> 6.0 Optional Tasks <br /> This task includes optional services to provide air permitting, noise attenuation assistance, and <br /> design of a standby diesel generator. <br /> 6.1 BAAQMD Permitting: Mizutani Environmental, a subconsultant to Carollo, will <br /> provide assistance to City with the preparation of documentation r ecessary for the <br /> successful submission of air permit application if a new standby generator is <br /> required. Mizutani environmental will also assist the City with responses to <br /> comments generated during the review period until the permit is approved. <br /> The estimated cost of Optional Task 6.1 is $4,356. <br />