My WebLink
|
Help
|
About
|
Sign Out
17
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2013
>
082013
>
17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2013 12:31:08 PM
Creation date
8/14/2013 2:25:49 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
8/20/2013
DESTRUCT DATE
15Y
DOCUMENT NO
17
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
control/stormwater quality measures shall be shown on the site plan <br /> submitted for a building permit, and shall be subject tc the review and <br /> approval of the Building and Safety Division. The project developer is <br /> responsible for ensuring that the contractor is aware of and implements <br /> such measures. <br /> 2. All cut and fill slopes shall be revegetated and stabilized after <br /> completion of grading, but in no case later than October 15. <br /> Hydroseeding shall be accomplished before September 15 and <br /> irrigated with a temporary irrigation system to ensure that the <br /> vegetated areas are established before October 15. No grading shall <br /> occur between October 15 and April 15 unless approved erosion <br /> control/stormwater quality measures are in place, subject to the <br /> approval of City Engineer/Chief Building Official. Such measures shall <br /> be maintained until such time as permanent landscaping is in place. <br /> 3. Gather all sorted construction debris on a regular basis and place in <br /> the appropriate container for recycling; to be emptied at least on a <br /> weekly basis. When appropriate, use tarps on the ground to collect <br /> fallen debris or splatters that could contribute to stormwater runoff <br /> pollution. <br /> 4. Remove all dirt, gravel, rubbish, refuse, and green waste from the <br /> street pavement and storm drains adjoining the site. Limit construction <br /> access routes onto the site and place gravel on them. Do not drive <br /> vehicles and equipment off paved or graveled areas during wet <br /> weather. Broom sweep the street pavement adjoining the project site <br /> on a daily basis. Scrape caked on mud and dirt from these areas <br /> before sweeping. <br /> 5. Install filter materials (such as sandbags, filter fabric, etc.) at the storm <br /> drain inlet nearest the downstream side of the project site in order to <br /> retain any debris or dirt flowing in the storm drain system. Maintain <br /> and/or replace filter materials to ensure effectiveness and to prevent <br /> street flooding. <br /> 6. Create a contained and covered area on the site for the storage of <br /> cement, paints, oils, fertilizers, pesticides, or other materials used on <br /> the site that have the potential of being discharged intc the storm drain <br /> system by being windblown or by being spilled. <br /> 7. Never clean machinery, equipment, tools, brushes, or rinse containers <br /> into a street, gutter, or storm drain. <br /> 14-Unit Development Plan Ponderosa Homes <br /> PUD-97, Conditions of Approval 29 of 31 4202 Stanley Boulevard <br />
The URL can be used to link to this page
Your browser does not support the video tag.