Laserfiche WebLink
Construction Requirements <br /> 148. The project shall comply with the "Construction General Permit" requirements of <br /> the NPDES Permit for construction activities (including other land disturbing <br /> activities) that disturb one acre or more (including smaller sites that are part of a <br /> larger common plan of development). <br /> Information related to the Construction General Permit is on line El: <br /> • http://www.waterboards.ca.gov/water issues/programs/stormwater/constructi <br /> on.html <br /> • http://www.waterboards.ca.qov/water issues/proqrams/stormwater/docs/final <br /> constpermit.pdf <br /> a. The Construction General Permit's requirements include, but are not limited <br /> to, the following: <br /> i. The project developer shall obtain a construction general permit (NOI) <br /> from the Regional Water Quality Control Board to discharge stormwater, <br /> and to develop and implement stormwater pollution prevention plans. <br /> ii. The project developer shall submit a Stormwater Pollution Prevention Plan <br /> (SWPPP) to the City Engineer/Chief Building Official for review and <br /> approval prior to the issuance of a grading or building permit, whichever is <br /> sooner. A copy of the approved SWPPP, including all approved <br /> amendments, shall be available at the project site for City review until all <br /> engineering and building work is complete and City permits have been <br /> finaled. A site specific SWPPP must be combined with prcper and timely <br /> installation of the BMPs, thorough and frequent inspections, maintenance, <br /> and documentations. SWPPP for projects shall be kept up to date with <br /> the projects' progress. Failure to comply with the most updated <br /> construction SWPPP may result in the issuance of correction notices, <br /> citations, and/ or stop work orders. <br /> iii. The project developer is responsible for implementing the following Best <br /> Management Practices (BMPs). These, as well as any other applicable <br /> measures, shall be included in the SWPPP and implemented as approved <br /> by City. <br /> 1. The project developer shall include erosion control/stormwater quality <br /> measures on the project grading plan which shall specifically address <br /> measures to prevent soil, dirt, and debris from entering the public <br /> storm drain system. Such measures may include, but are not limited <br /> to, hydroseeding, hay bales, sandbags, and siltation fences and shall <br /> be subject to the review and approval of the City Engineer/Chief <br /> Building Official. If no grading plan is required, necessary erosion <br /> 14-Unit Development Plan Ponderosa Homes <br /> PUD-97, Conditions of Approval 28 of 31 4202 Stanley Boulevard <br />