My WebLink
|
Help
|
About
|
Sign Out
17
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2013
>
082013
>
17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2013 12:31:08 PM
Creation date
8/14/2013 2:25:49 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
8/20/2013
DESTRUCT DATE
15Y
DOCUMENT NO
17
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Livermore-Pleasanton Fire Department for review and approval prior to <br /> installation. The fire alarm system, including water flow and valve tamper, shall <br /> have plans and specifications submitted to Fire Prevention for review and <br /> approval prior to installation. All required inspections and witnessing of tests <br /> shall be completed prior to final inspection and occupancy of the building(s). <br /> URBAN STORMWATER CONDITIONS <br /> 143. The project developer shall include erosion control measures, prepared and <br /> signed by the Qualified Storm Water Pollution Prevention Plan Developer (QSD), <br /> on the final grading plan, subject to the review of the City Engineer. These <br /> erosion control measures shall be as required by the state's Construction <br /> General Permit. The project developer is responsible for ensuring that the <br /> contractor is aware of such measures. All cut and fill slopes shal be revegetated <br /> and stabilized as soon as possible after completion of grading, in no case later <br /> than October 15. No grading shall occur between October 15 and April 15 <br /> unless approved erosion control measures are in place, subject to the approval <br /> of the project QSD and the City Engineer. Such measures sha I be maintained <br /> until such time as a permanent landscaping is in place, site is stabilized and <br /> Notice of Completion (NOC) has been filed with the State Regional Water Board <br /> and/or accepted by City. <br /> 144. Homeowner Association shall be responsible for annual inspection, maintenance, <br /> and reporting of all stormwater NPDES facilities in accordance with the Operation <br /> and Maintenance Agreement executed between the City of Pleasanton and the <br /> Ponderosa Homes representative and recorded at the Alameda County <br /> Recorder's office. <br /> 145. The project shall comply with the City of Pleasanton's Stormwater NPDES Permit <br /> #CAS612008, dated October 14, 2009 and amendments (hereafter referred to as <br /> NPDES Permit). This NPDES Permit is issued by the California Regional Water <br /> Quality Control Board, San Francisco Bay Region (hereafter referred to as <br /> Regional Water Quality Control Board). Information related to the NPDES Permit <br /> is available at the City of Pleasanton Community Development Department, <br /> Engineering Division, and on line at: <br /> • http://www.ci.pleasanton.ca.us/business/planning/StormWater.html <br /> • http://www.waterboards.ca.qov/sanfranciscobay/water issues'proqrams/stor <br /> mwater/Municipal/index.shtml <br /> Design Requirements <br /> 146. NPDES Permit design requirements include, but are not limited to, the following: <br /> a. Source control, site design, implementation, and maintenance standards <br /> when a regulated project (such as a residential subdivision project) creates <br /> 14-Unit Development Plan Ponderosa Homes <br /> PUD-97, Conditions of Approval 25 of 31 4202 Stanley Boulevard <br />
The URL can be used to link to this page
Your browser does not support the video tag.