My WebLink
|
Help
|
About
|
Sign Out
07
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2013
>
082013
>
07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2013 12:29:32 PM
Creation date
8/14/2013 2:09:12 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
8/20/2013
DESTRUCT DATE
15Y
DOCUMENT NO
07
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Title 24 Energy Code Surcharge. A 25% surcharge fee to both the permit and plan review is <br /> assessed on all building areas containing space subject to the provisions of the California <br /> Energy Code. <br /> 3. Disabled Access Surcharge. Th Is 15% surcharge to the Building Permit Fee Is assessed to <br /> all permits for projects which are required to be accessible, public buildings. commercial and <br /> multi-family residential buildings. <br /> 4. Sub-Trades: Electrical, Plumbing and Mechanical Permit Fees. Stand alone electrical, <br /> mechanical or plumbing (sub-trades) permit fees are assessed on a per item basis. as shown <br /> on pages 8-10 Sub-trade fees for all new residential construction are assessed on a cost per <br /> square foot basis. All building permits with associated sub-trades are assessed a single sub- <br /> trade permit fee, 25% of the building permit fee. covering all electrical, mechanical and/or <br /> plumbing work. <br /> 5. Plan Review Fees. Plan review fees are collected for all applicable plan reviews that apply to <br /> any given project. Fees for the Initial plan review of buildings, structures and fire sprinkler <br /> systems are a percentage of the Building Permit Fee that was calculated in step number 1 <br /> above. Fees for revisions to previously approved plans are based upon the time needed for <br /> review at the current rate of the reviewer, with a minimum charge of one hour plus <br /> administrative charges. <br /> Note: A fast-track plan review is evadable for most reviews. Please contact the Building Division for <br /> specific details. <br /> Building Code plan review: 65%of the Building Permit fee, 598.48 minimum. <br /> Sub-Trades plan review. 25%of the Building Code plan review fee. <br /> Fire Department Life Safety/Egress plan review:25%of the Building Permit fee. <br /> Green Building plan review(projects subject to Green Building Standards), $295.44 minimum. <br /> 6. Fire Sprinkler Plan Check and Permit Fee. Fire Sprinkler plan review and permit fees are paid <br /> at the time of submittal in the Permit Center. These fees are based on the cast of the sprinkler <br /> system for new construction and alteration, and are calculated in the same manner as Items 1 & <br /> 5 above, but use a valuation factor of$4.45 per square foot. The minimum plan check fee is <br /> $98.48. based upon the current plan review rale of our consultants. <br /> Note: The contract price is used for valuation to determine plan check end pemit fees for small <br /> aiferabons to existing system where fewer than five broads are added or relocated. <br /> 7 Fire Alarm Plan Check and Permit Fee. The minimum fee for fire alarm system Installations <br /> and alterations is $275.00, collected at the time of submittal for plan review The Fire Alarm <br /> Permit fee is based on the number of hours the Fire Department estimates the field Inspection <br /> lime will entail, plus administrative and archiving fees. <br /> 8. Hazardous Materials Plan Check and Permit fee. The initial plan submittal fee for the review <br /> and inspection of hazardous material installations is$420.00 The Hazardous Materials Permit <br /> fee Is based on the Fire Department estimate of field inspection time. plus, administrative & <br /> archiving fees. <br /> 9. On-Site Permits, On-Site permits are required for improvements outside of structures on <br /> private properly such as curb S gutter, sidewalk, pavement, underground piping, site fighting, <br /> erosion control. etc. The plan review lee Is 0.6% of the estimated value of Cie improvements. <br /> and the onsite permit fee is 1.4%of the estimated value of the improvements. <br /> Page 2 of 10 <br /> Fa c.,,. . 7 14- . <br />
The URL can be used to link to this page
Your browser does not support the video tag.