My WebLink
|
Help
|
About
|
Sign Out
07
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2013
>
082013
>
07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2013 12:29:32 PM
Creation date
8/14/2013 2:09:12 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
8/20/2013
DESTRUCT DATE
15Y
DOCUMENT NO
07
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE CITY OF BUILDING PERMIT AND <br /> pL£ASANTON DEVELOPMENT FEES <br /> July 1, 2013 <br /> Many complex fees have been presented in a simplified form to assist the estimator. The values <br /> shown in this document reflect the fee rates in effect at the time of publication and are subject to <br /> change without notification. Actual fee amounts are calculated by the Permit Center staff for <br /> every permit The values shown in this document are for estimating purposes only. <br /> Plan Review fees are due at time of application submittal: building permit and impact fees are <br /> due at the time of permit issuance. Building Permit Fees are based upon the building permit fee <br /> schedule in effect at the time of permit application Development Fees are based upon the <br /> applicable rate in effect at the time of payment at permit issuance, not application date and are <br /> only applicable on newly constructed buildings, additions or on a change of use in an existing <br /> building Pre-payment of building permit fees or impact fees before issuance is not permitted. <br /> Project valuation is the basis of all building permit and plan review fees Alterations, Remodels <br /> and Tenant Improvements use the contract price for the work as the valuation, but new project <br /> valuation is determined from our valuation table. See a partial table below for a sample of some <br /> common project types. For uses not shown please contact the Building and Safety Division. <br /> Use Occupancy Group Construction Type Rate(per Sq Ft) <br /> Single Family Dwelling R-3 VB 3131.30 <br /> Private Garage U VB $47.44 <br /> Apenment Building R-2 VB $117 30 <br /> UVarehouse,uncandtioned S-1 IIIB $81.99 <br /> Office Bulking B VB $150.89 <br /> Retail Store M VB $113.72 <br /> Restaurant A-2 VA $147.85 <br /> 1 Building Permit Fee_ Once a valuation has been Example:A new 2,500 sf dwelling with a <br /> determined for a project. the Building Permit Fee can be 650 sr garage: <br /> calculated based on the Fee Table shown below. Many <br /> subsequent fees and charges are based on a percentage First,calculate the total valuation <br /> of this base fee 2500x$131.301sf: $328,250.00 dwelling <br /> 650 x$47.44151: 4$30.89&00 garage <br /> Total Valuation Base Fee Rate per each Total valuation $359,066.60 <br /> Unit above Base <br /> $1 to$500 $23,50 Then, calculate fees <br /> $501 to$2,Dal 523.50 $3.05 per$100• [39 Bailing Permit fee,based or 3369.086.00: <br /> p [5993.75+ 1260'x$5.6011= $2449.75 <br /> $2001 to$25,000 $69.25 $14.00 per$1,000' 1-22-55:1;41/4 g surcharge, <br /> 9.75 - $612.44 <br /> $25,001 to$50,000 $391.25 $10.10 per$1,000* EulJng Plan Review fee, <br /> $50,001 to$100 000 $643.75 $7.00 per$1,000' 65x'$2,449-75 81,59234 <br /> T-24 Energy Plan Review tee, <br /> —a $100,001 to$500.000 $993.75 55.60 per$1.000' 25%'5612.44 = $15111 <br /> $500,001 to$1,000 000 $3,233.75 $4.75 per$1000' <br /> $1.000.001 and over $5.608.75 $3.65 per$1,000" a 1350,086.00-10110C(191000=259.09' use 260 <br /> 'or fraction thereof over Mita&base amount <br /> 1 . 1F <br />
The URL can be used to link to this page
Your browser does not support the video tag.