My WebLink
|
Help
|
About
|
Sign Out
08
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2013
>
071613
>
08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2013 4:29:59 PM
Creation date
7/9/2013 4:29:54 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
7/16/2013
DESTRUCT DATE
15Y
DOCUMENT NO
08
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8. Assist the City in evaluation, creation and processing all required <br /> environmental documents and permits. <br /> 9. Prepare detailed project specifications and other contract <br /> documents including Special Provisions and Technical <br /> Specifications to incorporate project-specific requirements and <br /> identify required submittals. <br /> 10.Prepare engineer's cost estimates for budget review and for bid <br /> evaluations. <br /> 11.Submit design documents at 35%, 65% and 100% for City's review <br /> and comments. Submit to Caltrans as required for their review and <br /> approval. Perform field review meeting at 35%with Caltrans to <br /> confirm E76 for preliminary engineering (PE) approval. 65% design <br /> shall include the as-built drawings for reference, right-of-way limits <br /> and maintenance recommendations. 100% design shall include <br /> completed design drawings and specifications. Final plans shall <br /> incorporate all comments and be ready for bidding. <br /> 12.Meet with City staff before start of work and after each submittal. <br /> 13. Answer all technical questions from prospective bidders during the <br /> bidding period and preparation of addenda, as necessary. <br /> - 2 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.