Laserfiche WebLink
IV. SUMMARY OF CIP EXPENDITURES <br /> The CIP includes a total of 62 projects recommended for funding over the first two years of the CIP and <br /> a total of 63 projects for all four years. Expenditures, including project reserves for FY 2013-14 are <br /> estimated at $17,103,460 and at $9,832,774 for FY 2014-14 for a total of 26,936,234 for the first two <br /> funded years. Total expenditures and reserves for all four years of the CIP are estimated at $39,112,944. <br /> A summary of the major funded projects is as follows: <br /> Summary of Major Funded Projects <br /> Streets <br /> • Provides a total of $9,200,000 over the four years of the CIP for street resurfacing. The <br /> $2,700,000 in each of the first two years of the program represents an increase (38%) over the <br /> $1,950,000 anticipated for 2013-14 in the Mid-Term CIP and consistent with needs outlined in <br /> the City's pavement management system. The actual streets to be resurfaced will be <br /> determined following an update to the City's pavement management system. Notwithstanding <br /> this funding, staff anticipates that additional street maintenance funding will be needed in the <br /> future to meet ongoing street maintenance needs. <br /> • Includes $3,240,000 for various street related maintenance and improvement projects <br /> including sidewalk replacement ($600,000), slurry sealing ($1,400,000), installation of traffic <br /> buttons and line markers ($200,000), sidewalk ramp installation ($520,OD0), annual evaluation <br /> of City streets ($120,000) and intersection improvements at various locations ($400,000). <br /> These funded amounts are consistent with funding in recent previous years. <br /> • Includes $500,000 for installation of traffic signals at various locations to be determined <br /> consistent with the General Plan and the City Traffic Improvement Fees. Signal locations will <br /> be presented to the City Council prior to awarding a contract to design and install. <br /> • Includes $150,000 to conduct bi-annual bridge maintenance on City bridges to assure they <br /> continue meeting Caltrans and City standards. In addition, also included is $500,000 for the <br /> Bridge Improvements at Various Locations and $671,400 for the Bridge Painting: Bernal <br /> Bridge over the Arroyo de la Laguna projects, which is funded during the next two fiscal <br /> years. <br /> • Includes $2,191,490 for the 1-580 at Foothill Road Improvements Phase 3. As detailed in the <br /> project description sheet on page 32, the funding for this year is part of the project's overall <br /> cost of $4,560,000. Phases 1 and 2 of this project included environmental work and design <br /> specifications. Phase 3 includes project construction to create a "T" style intersection at <br /> Foothill Road just south of the I-580 interchange. With this funding, staff anticipates the <br /> project moving forward in 2013/14. <br /> • Includes $675,000 for installation of bicycle and pedestrian improvements at various locations <br /> based on need and recommendations by City commissions, committees and staff; and <br /> $103,745 for a bicycle detection system at select intersections on Hopyard Road. <br />