My WebLink
|
Help
|
About
|
Sign Out
13
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2013
>
061813
>
13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2013 4:38:34 PM
Creation date
6/12/2013 4:38:27 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/18/2013
DESTRUCT DATE
15Y
DOCUMENT NO
13
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3: Harris Design <br /> Bernal Community Park Phase 2 <br /> Additional Services Request <br /> 3. Domestic Water Line for Oak Woodland <br /> Bellecci will provide a domestic water service for the Oak Woodland.As part of the services Bellecci will <br /> prepare a hydraulic calculation to verify adequate flow and pressure. Bellecci will add water service pipe to <br /> the park utility plans. Backflow preventer and drinking fountain will be on the landscape architecture <br /> plans. <br /> Budget <br /> Our proposed budget for Task 4 is$3,300. <br /> 4. Value Engineering Services&Updated LID Calcs <br /> Bellecci provided value engineering services for Bernal Park Phase 2 between February 2013 and June <br /> 2013.Value engineering services included, preparing alternative design sketches,evaluating alternatives <br /> for construction cost reduction,cost estimating,conceptual pond analysis, preliminary hydraulic <br /> calculations,coordination and meetings,and site visits. Part of the solution for Value Engineer was to <br /> delete LID's from parking lot area and discharge into basin.Therefore Bellecci will update the LID <br /> calculations to reflect the new site plan, using the CAD file from Harris Design of the new footprint of the <br /> project. <br /> Budget <br /> Our proposed budget for Task 4 is$8,000. <br /> 5. Gas Line <br /> Bellecci to show gas line on the park utility plan. Pipe sizing per building plans. Make minor plan revisions <br /> per comments from City, PG&E and Building Architect. Budget for Task 5=$2,300 <br /> Total Budget For Tasks 1-5:$39,100 <br /> We appreciate the opportunity to continue services on this extremely important project in our community. <br /> Please let me know if you have any further questions regarding the Bernal Avenue Community Park Phase 2 <br /> proposal. You may reach my direct line at 925.681.4880. <br /> Sincerely, <br /> BELLECCI&ASSOCIATES,INC. <br /> 41141 411 <br /> OPPr <br /> Daniel C. Leary, PE LEED AP BD+C <br /> Principal <br /> PE License U:C48394 <br />
The URL can be used to link to this page
Your browser does not support the video tag.