Laserfiche WebLink
Bernal Community Park Phase 2-Oak Woodland Area Design <br /> HARRIS DESIGN TASKS/HOURS Principal/PM LA 3 LA 1 Total <br /> $ 175 $ 130 $ 105 <br /> 1.0 Schematic Design <br /> 1 Concept plan 20 24 <br /> 2 Cost estimate __ 2 4 <br /> 3 Color plan rendering 4 8 <br /> 4 Prepare powerpoint presentation with images 2 12 <br /> 5 <br /> 5 Parks and Recreation Commission presentation 6 _ <br /> 7 City Council Presentation 6 <br /> 7 Project be MaougemenUCoordinalion 8 <br /> Subtotal Hours 44 4 48 <br /> Subtotal Fees-66% $ 7,700 $ 620 $ 6,040 $ 13,280 <br /> 12.0 Design Development <br /> 1 Site Design 16 40 <br /> 2 Base plan(6sheets OD 30x42) i_ 4 _ 24 _ <br /> 3 Gracing plan , 16 16 <br /> 4 Construction Materials plan(no layout) 8 4 12 <br /> 5 Planting plan(trees and mass planting areas only) _ 8 24 <br /> 6 Cost estimate 8 8 <br /> 7 In-house plan check 2 4 _. <br /> e Pick ups 1 8 <br /> 9 Project Management/Coordination 8 4 <br /> Subtotal l Hours Hours 34 88 92 <br /> Subtotal Fees-85% $ 6,960 I$ 11,440 $ 9,660 $ 27,060 <br /> X3.065%CD <br /> 1 Update base sheets per review comments 8 16 <br /> ■ <br /> 2 Grading plan 4 8 8 16 <br /> 3 Construction Materials and Layout plan 4 32 <br /> 4 Entry and Interpretive Node Detail pans(4 ea.on 1 sh ) _ 8 24 <br /> 5 Planting plan 16 40 <br /> 6 Irrigation plan-not included <br /> 7 Footbridge selection,coordination,and specs � 6 <br /> I <br /> 8 Footbridge details I 4 16 <br /> 9 Site Details I, 8 32 <br /> 10 Park entry sign/monument details 4 16 <br /> 11 Cost estimate � _ 2 4 <br /> 12 In-house plan check 4 8 <br /> 13 Pick ups 16 <br /> 14 Protect Management/Coordination 8 8 - <br /> Subtotal Hours 16 84 212 <br /> Subtotal Fees-90% $ 2,800 $ 10,920 $ 22,260 $ 36,980 <br /> 3.090%CD <br /> 1 Update base sheets per review comments 8 <br /> - <br /> 3 Cons ru plan 2 6 16 <br /> 3 Construction l n Matetve and Layout plan 4 8 <br /> 4 Entry and Interpretive Node Detail plans(4 ea.on 1 sheet) 4 8 <br /> 5 Pianttion plan 4 12 <br /> 7 Footbridge elan-notlncooetl <br /> 7 Footbridge detection,cooNinetion,and specs 1 4 2 4 <br /> 8 Footbridge details <br /> 9 Site Details 8 16 <br /> 10 Park entry sign/monument details 2 4 <br /> 11 Cost estimate r_ ___ 2 4 <br /> 12 In-house plan check _ 8 _ 8 <br /> 13 Pick ups 12 <br /> 14 Project l Hours Management/Coordination 8 8 <br /> Subtotal Hours 18 52 96 <br /> Subtotal Fees-90% $ 3,150 $ 6,760 $ 10,080 $ 19 990 <br /> 3.0100%CD <br /> 1 Update base sheets per review comments _4_ <br /> 2 Grading plan —.. 4 8 <br /> • <br /> 3 Construction Materials and Layout plan ,_ 4 16 <br /> 4 Entry and Interyretive Node Detail plans(4 ea.on 1 sheet) 4 4 <br /> S Planting plan _ 4 8 <br /> 6 Footbridge plan-not included <br /> • <br /> 7 Park entry iglection,meat details s and specs 4 2 <br /> 8 Footbridge entry sign/monument tletails _ � 4_ _ 2 4 <br /> 9 Footbridge tletails ' 4 <br /> 10 Site Details I 4 9 <br /> 11 In-ht estimate <br /> plan 2 4 _ _ <br /> 13 Pick ups plan check 8 �_ 8_ <br /> 13 Pick ups I - - 8 <br /> 14 Project Management/Coordination 8 8 <br /> Subtotal Hours 16 42 68 <br /> Subtotal Fees-100% $ 2,800 $ 6,460 $ 7,140 $ 16400 <br /> 13.0 Final BId Documents <br /> 1 Update base sheets per review comments 2 <br /> 2Gradingplan _ _ _ 2 8__ <br /> - - _ <br /> 3 Construction Materials and Layout plan 4 8 <br /> 4 Entry and Interpretive Node Detail plans(4 ea.on 1 sheet) _ _ 4 _ _ 8 <br /> 5 Planting plan _ 4 4 <br /> 6 Footbridge plan coon,included _. <br /> 7 Footbridge detadion,ccoNination,and specs 2 _ <br /> 8 Footbridge retails 2 <br /> Site Details <br /> Site Details _ I 4 8 <br /> 10 Park entry sign/monument retails - - t 2 4 <br /> 11 Cost estimate � 2 4 _ <br /> 12 In-house plan check 8 I 8 <br /> 13 Pick ups 8 <br /> 14 Project menVCOOminetion a 4 <br /> Subtotal l Hours Hours 16 34 56 <br /> Subtotal Fees-Final Bid Documents $ 2,800 $ 4,420 $ 6,880 $ 13.100 <br /> Total Hours 144 304 572 <br /> Total Fees $ 26,200 $ 39,620 $ 60,060I$ 124780 <br />