My WebLink
|
Help
|
About
|
Sign Out
07
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2013
>
061813
>
07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/8/2015 2:45:36 PM
Creation date
6/12/2013 4:25:09 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/18/2013
DESTRUCT DATE
15Y
DOCUMENT NO
7
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Contractor shall be responsible for responding to ALL CALLS(including potentially false calls) <br /> from designated City officials.This service will be included in the monthly preventative maintenance <br /> costs. <br /> 3.1 Monitoring Emergency Calls <br /> Upon completion of emergency work,the Contractor shall call the City Traffic Engineering Division <br /> to notify City staff that the emergency work has been completed. <br /> 3.2 Liquidated Damages <br /> It is understood and agreed that failure on part of the Contractor to respond within one (1) hour, <br /> under normal conditions for emergency calls as provided in Section 3.0,will cause the City to suffer <br /> an unascertainable amount of damages. Contractor agrees to pay to the City,not as a penalty but as <br /> liquidated damages,the amount of$100 per hour that the Contractor is late to arrive. This amount is <br /> to be deducted from any payment due or to become due to the Contractor. <br /> 3.3 Non-emergency Service <br /> All other non-emergency calls shall be responded to within 24 hours or as mutually agreed upon <br /> between the City Traffic Engineering Division and Contractor for each individual service call. <br /> 4. SIGNAL UPGRADES AND INSTALLATIONS <br /> The Contractor shall, if requested, install, modify and/or upgrade traffic signals or traffic safety <br /> devices. All additional work shall be performed to the satisfaction of the City Traffic Engineering <br /> Division. <br /> No additional work shall be commenced or undertaken by Contractor without written approval by the <br /> City Traffic Engineering Division.Additional work shall be performed in accordance with the most <br /> current version of the California Manual of Uniform Traffic Control Devices, State of California <br /> Department of Transportation Standard Plans and Standard Specifications, and the City of <br /> Pleasanton Community Development Standard Specifications and Details. This work shall be <br /> performed within the time limit established by the City Traffic Engineering Division and at the <br /> mutually agreed upon price. <br /> City shall retain the right to perform any additional work by use of City forces or,in the alternative, <br /> to advertise such work for bids. <br /> 5. RECORDS <br /> 5.1 Intersection Records <br /> Traffic Signal Maintenance Contract Contract No. <br /> Attachment 3—Scope of Work Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.