My WebLink
|
Help
|
About
|
Sign Out
10
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2013
>
060413
>
10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/8/2015 2:41:45 PM
Creation date
5/29/2013 1:16:03 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/4/2013
DESTRUCT DATE
15Y
DOCUMENT NO
10
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i. The project developer/applicant shall include erosion control/stormwater <br /> quality measures on the project grading plan which shall specifically <br /> address measures to prevent soil, dirt, and debris from entering the public <br /> storm drain system. Such measures may include, but are not limited to, <br /> hydroseeding, hay bales, sandbags, and siltation fences and shall be <br /> subject to the review and approval of the City Engineer/Chief Building <br /> Official. If no grading plan is required, necessary erosion <br /> control/stormwater quality measures shall be shown on the site plan <br /> submitted for a building permit, and shall be subject to the review and <br /> approval of the Building and Safety Division. The project <br /> developer/applicant is responsible for ensuring that the contractor is aware <br /> of and implements such measures. <br /> ii. All cut and fill slopes shall be revegetated and stabilized after completion <br /> of grading, but in no case later than October 15. Hydroseeding shall be <br /> accomplished before September 15 and irrigated with a temporary <br /> irrigation system to ensure that the vegetated areas are established before <br /> October 15. No grading shall occur between October 15 and April 15 <br /> unless approved erosion control/stormwater quality measures are in place, <br /> subject to the approval of City Engineer/Chief Building Official. Such <br /> measures shall be maintained until such time as permanent landscaping is <br /> in place. <br /> iii. Gather all sorted construction debris on a regular basis and place in the <br /> appropriate container for recycling; to be emptied at least on a weekly <br /> basis. When appropriate, use tarps on the ground to collect fallen debris <br /> or splatters that could contribute to stormwater runoff pollution. <br /> iv. Remove all dirt, gravel, rubbish, refuse, and green waste from the street <br /> pavement and storm drains adjoining the site. Limit construction access <br /> routes onto the site and place gravel on them. Do not drive vehicles and <br /> equipment off paved or graveled areas during wet weather. Broom sweep <br /> the street pavement adjoining the project site on a daily basis. Scrape <br /> caked on mud and dirt from these areas before sweeping. <br /> v. Install filter materials (such as sandbags, filter fabric, etc.) at the storm <br /> drain inlet nearest the downstream side of the project site in order to retain <br /> any debris or dirt flowing in the storm drain system. Maintain and/or <br /> replace filter materials to ensure effectiveness and to prevent street <br /> flooding. <br /> vi. Create a contained and covered area on the site for the storage of <br /> cement, paints, oils, fertilizers, pesticides, or other materials used on the <br /> site that have the potential of being discharged into the storm drain system <br /> by being windblown or by being spilled. <br /> vii. Never clean machinery, equipment, tools, brushes, or rinse containers into <br /> a street, gutter, or storm drain. <br /> Page 15 of 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.