My WebLink
|
Help
|
About
|
Sign Out
10
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2013
>
060413
>
10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/8/2015 2:41:45 PM
Creation date
5/29/2013 1:16:03 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/4/2013
DESTRUCT DATE
15Y
DOCUMENT NO
10
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
development. These devices shall trap particles of 5mm or greater and have <br /> treatment capacity not less than the peak storm from a "one year, one hour" <br /> event within the drainage area. The project developer/applicants engineer shall <br /> submit calculations and product submittals to the City Engineer for review and <br /> approval prior to the issuance of a grading or building permit, whichever is <br /> sooner. <br /> B. Construction Requirements <br /> The project shall comply with the "Construction General Permit" requirements of the <br /> NPDES Permit for construction activities (including other land disturbing activities) that <br /> disturb one acre or more (including smaller sites that are part of a larger common plan <br /> of development). <br /> Information related to the Construction General Permit is on line at: <br /> • http://www.waterboards.ca.qov/water issues/proqrams/stormwater/construction <br /> .shtml <br /> • http://www.waterboards.ca.gov/water issues/proqrams/stormwater/docs/finalco <br /> nstpermit.pdf <br /> 1. The Construction General Permit's requirements include, but are not limited to, <br /> the following: <br /> a. The project developer/applicant shall obtain a constructior general permit <br /> (NOI) from the Regional Water Quality Control Board to discharge <br /> stormwater, and to develop and implement stormwater pollution prevention <br /> plans. <br /> b. The project developer/applicant shall submit a Stormwater Pollution <br /> Prevention Plan (SWPPP) to the City Engineer/Chief Building Official for <br /> review and approval prior to the issuance of a grading or building permit, <br /> whichever is sooner. A copy of the approved SWPPP, including all approved <br /> amendments, shall be available at the project site for City review until all <br /> engineering and building work is complete and City permits have been <br /> finaled. A site specific SWPPP must be combined with proper and timely <br /> installation of the BMPs, thorough and frequent inspections, maintenance, <br /> and documentations. SWPPP for projects shall be kept up to date with the <br /> projects' progress. Failure to comply with the most updated construction <br /> SWPPP may result in the issuance of correction notices, citations, and/ or <br /> stop work orders. <br /> c. The project developer/applicant is responsible for implementing the following <br /> Best Management Practices (BMPs). These, as well as any other applicable <br /> measures, shall be included in the SWPPP and implemented as approved by <br /> the City. <br /> Page 14 of 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.