My WebLink
|
Help
|
About
|
Sign Out
09
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2013
>
060413
>
09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2013 1:13:30 PM
Creation date
5/29/2013 1:10:33 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/4/2013
DESTRUCT DATE
15Y
DOCUMENT NO
09
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Mitigation Measures 4.D-1a and 4.0-lb include the <br /> requirement for a historic resource evaluation at Sites 6 and 21. Mitigation <br /> Measure 0-la and D-1 b as set forth in Table 6-1 of the Final El IR and listed in the <br /> MMRP are hereby incorporated by reference and described below: <br /> 4.D-la: On Sites 6 and 21, prior to PUD approval or demolition, whichever <br /> comes first, the project applicant shall have a historic resource evaluation <br /> conducted for the ice house and farmhouse on Site 6 and for the residence on <br /> Site 21 as applicable. If it is determined that a structure is historic, Mitigation <br /> Measure 4.13-lb will be required. If a structure is not found to be historic, <br /> demolition of the structure will be considered a less than significant impact. <br /> 4.D-lb: If the historic resources evaluation determines that Site 6 or 21 contains <br /> a historic resource, prior to demolition, the structure shall be documented <br /> according to Historic American Building Survey (HABS) standards. These <br /> standards include large format black and white photographs, an historical <br /> narrative describing the architectural and historical characteristics of the building, <br /> and measured drawings (or reproduced existing drawings if available). The <br /> HABS documentation shall be archived at the City of Pleasanton Planning <br /> Department and the City of Pleasanton Public Library. <br /> 3. Implementation of Mitigation Measures 4.D-la and 4.0-lb <br /> would not reduce the impact to less than significant as demolition of the <br /> structures on Site 6 and 21 could result in an adverse change in the significance <br /> of a historical resource as defined in CEQA Guidelines Section 15064.5. <br /> (Draft SEIR, pp. 4.D-15 to 4.0-16.) <br /> 2. Transportation and Traffic <br /> Impact 4.N-7 <br /> Development facilitated by the General Plan Amendment and rezonings could <br /> potentially add traffic to the regional roadway network to the point at which they would operate <br /> unacceptably under Cumulative plus Project conditions. <br /> The SEIR evaluates the impact of the proposed project related to the potential to <br /> add traffic to the regional roadway network to the point at which they would operate <br /> unacceptably under Cumulative plus Project conditions. <br /> Significance Before Mitigation: Significant <br /> Significance After Mitigation: Significant and Unavoidable <br /> Finding: Changes or alterations have been required in or incorporated into the <br /> Project, however, the changes would not reduce this impact to a less than <br /> significant level. Mitigation Measure 4.N-7 is required in or incorporated into the <br /> Project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.