Laserfiche WebLink
ENGEO <br /> EQUIPMENT AND MATERIALS CHARGES Expect Cxcellenco <br /> DESCRIPTION COST PER UNIT <br /> UNIT($) <br /> Air Content Meter 7.00 hour <br /> Bailers(Disposable) 8.00 each <br /> Concrete Crack Monitor 20.00 each <br /> Coring Machine 25.00 hour <br /> Cylinder Pick Up 200.00 pick up <br /> Electronic Water Level Indicator 5.00 hour <br /> Engineering Analysis Software 25.00 hour <br /> Equipment Transport(er) 100.00 hour <br /> Floor Flatness/Floor Level Equipment 20.00 hour <br /> Generator 15.00 hour <br /> GPS Hand Held(Garmin) 5.00 hour <br /> GPS Survey Grade(Trimble) 90.00 hour <br /> Hydraulic Pull-Test Equipment 15.00 hour <br /> Interface Probe 2.00 hour <br /> Magnetic Particle Test Equipment 8.00 hour <br /> Moisture Content Test Equipment 6.00 hour <br /> Multi-Parameter Water Meter 15.00 hour <br /> pH Meter/Turbidity Meter 10.00 hour <br /> Photo Ionization Detector 15.00 hour <br /> R Meter(Pachometer) 15.00 hour <br /> Schmidt Hammer 20.00 hour <br /> Skidmore Wilhelm Bolt Tension Calib. 10.00 hour <br /> Slope Inclinometer/Settlement Indicator/VW Readout 50.00 hour <br /> Ultrasonic Equipment 25.00 hour <br /> Vapor Emission Test Kit 25.00 kit <br /> Vector Conversion 60.00 conversion <br /> Nuclear gauge 20.00 hour <br /> Water Sampling Pumps 20.00 hour <br /> Bridge Toll actual actual <br /> Mileage .78 mile <br /> Parking actual actual <br /> Trailer 15.00 hour <br /> AutoCAD,Terramodel(Hardware&Software) 18.00 hour <br /> July 1,2013 <br />