My WebLink
|
Help
|
About
|
Sign Out
15 ATTACHMENT 5 AND 6
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2013
>
052113
>
15 ATTACHMENT 5 AND 6
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/8/2015 2:36:41 PM
Creation date
5/15/2013 4:22:36 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
5/21/2013
DESTRUCT DATE
15Y
DOCUMENT NO
15 ATTACHMENTS 5 AND 6
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DRAFT <br />Commissioner Posson noted that he was not at the November Work Session and asked <br />for some background information regarding the issue of the bars on the windows. <br />Mr. Dolan stated that he thinks the Commission thought that bars on the windows <br />leaves an impression that this is not a safe place, and Pleasanton does not really have <br />bars on windows. He explained that in this case, the applicant believes and staff agrees <br />that this is an architectural detail that is consistent with the style and actually adds to the <br />design. He added that driving down West Las Positas Boulevard does not typically <br />make one think of being in an unsafe neighborhood, and staff believes that is really not <br />going to occur to anybody. <br />Commissioner Posson inquired if the bars will be only on certain windows and not on all <br />of them. <br />Mr. Dolan said yes. <br />THE PUBLIC HEARING WAS OPENED. <br />Ardie Zahedani, Vice President of St. Anton Partners, stated that he appreciated the <br />opportunity to be before the Commission to present this project. He indicated that <br />present in the audience to answer questions are Keith Labis, Project Architect, from <br />KTGY Group, Inc; Linda Gates from Gates and Associates; and Mike Serpa, Project <br />Advocate and Consultant. <br />Mr. Zahedani then presented a brief background on St. Anton Partners. stating that it is <br />a privately -owned company founded in 1995 by two gentlemen who are involved in <br />every detail of its projects. He noted that one of the founders, Peter Jeremy, was in the <br />audience. He continued that the company develops, builds, owns, and manages <br />6,500 units throughout California, 2,000 of which are in the Bay Area. He added that <br />the company, which has about 300 employees, never outsources its projects, such that <br />it fixes any problems its projects may have. <br />Mr. Zahedani then gave a little bit of project history, noting that one of the reasons the <br />company pursued and purchased the project site from Nearon was because on June 1, <br />2011, this site was ranked among one of the highest with 20 points for site amenities <br />including its proximity to transit, parks, and schools. He indicated that they submitted <br />an application to develop in September 2012 and had a very productive Planning <br />Commission Work Session in November 2012. He commended Pleasanton as one of <br />the few cities that provides its applicants with upfront feedback, both from a planned <br />development review committee and at a Planning Commission workshop, such that the <br />developer is not out spending hundreds, if not millions, of dollars before it gets its first <br />feedback. He thanked the Commission and staff for such a fruitful process. <br />Mr. Zahedani stated that the application was deemed complete in January 2013, and <br />one of its proudest achievements was getting unanimous approval from the Housing <br />DRAFT EXCERPT: PLANNING COMMISSION MINUTES, 5/8/13 Page 3 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.