My WebLink
|
Help
|
About
|
Sign Out
ORD 2009
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
2001 - 2100
>
ORD 2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:22:02 PM
Creation date
3/13/2013 12:44:21 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
9/21/2010
DOCUMENT NO
ORD 2009
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c. The storm drainage system will be reviewed by the City Engineer and Zone 7, <br /> as applicable. The system will be designed to be adequate, connect to an <br /> approved point of discharge, meet any applicable requirements of the <br /> Alameda County Flood Control District - Zone 7, meet any applicable <br /> requirements of the Federal Emergency Management Flood Hazard Program, <br /> and the California Department of Fish and Game. <br /> 7. Emergency Services. The following items will be provided prior to any <br /> construction above the foundation or slab. <br /> a. Where on site fire hydrant(s) are required, they will be installed, flushed and <br /> all valves open prior to any construction above the foundation or slab. <br /> b. All fire hydrants will be acceptance inspected and tested to applicable City <br /> Public Works Standards. <br /> c. Where on site grading/utility plans are submitted for review and approval prior <br /> to building construction drawings, emergency vehicle access routes, fire <br /> hydrant locations, material staging areas, etc. will be provided. <br /> 8. Construction Requirements. <br /> a. Sonic vermin control will occur immediately prior to and during grading and <br /> construction. The details of the sonic rodent control measures, including the <br /> location of the sonic devices will be submitted to and be subject to the review <br /> and approval of the Director of Community Development prior to the issuance <br /> of a grading permit or building permit, whichever is sooner. The approved <br /> measures will be included in the plan sets submitted for the issuance of a <br /> grading permit and the plans submitted for the issuance of a building permit. <br /> b. Dust and mud will be contained within the boundaries of the property during <br /> times of construction. A written dust control plan or procedure will be <br /> included in the building permit plans. <br /> c. Portable toilets used during construction will be emptied on a regular basis as <br /> necessary to prevent odor. <br /> d. Construction trailers will be allowed to be placed on the project site for daily <br /> administration/coordination purposes during the construction period. At no <br /> time will campers, trailers, motor homes, or any other vehicle be used as <br /> living or sleeping quarters on the construction site. All such vehicles will be <br /> removed from the site at the end of each workday. <br /> e. Any damage to existing street or sidewalk improvements during construction <br /> on the subject property will be repaired to the satisfaction of the City <br /> Engineer. <br /> This will include slurry seal, overlay, or street reconstruction if deemed warranted <br /> by the City Engineer. <br /> Conditions of Approval/PUD-80 <br /> Page 6 of 25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.