Laserfiche WebLink
The Task Force has made substantial progress on the first three steps in this process <br /> and is about to embark on the preparation of a range of alternative plans. <br /> OPPORTUNITIES AND CONSTRAINTS <br /> The discussion about development and conservation options will be informed by an <br /> understanding of the constraints and opportunities presented by this area. The <br /> following is a brief summary of some of the issues; the maps in Attachment 2 show the <br /> location of these areas. <br /> Opportunity/Constraint: <br /> • Lakes — approximately 700 acres of the total 1,100 acres in the Specific Plan <br /> area are lakes and immediately surrounding land. The lakes present both <br /> opportunities in terms of habitat, visual separation, recreational value and <br /> constraints regarding the location and configuration of El Charro Road and future <br /> development. <br /> Opportunities: <br /> • Open space system opportunities — the area presents opportunities for <br /> conservation and enhancement of habitat and scenic values, for new trails and <br /> connections to regional trails, and for meeting future park and other recreational <br /> needs. <br /> • East Pleasanton as a unique and distinct part of the City — development can build <br /> on the unique views and scenic value of the site. <br /> • Sustainable/Smart Growth in a strategic location in the Tri-Valley. Market <br /> prospects for a range of residential, retail, office and other development types are <br /> generally positive, although the amount, type and timeframe for new <br /> development will vary by use. <br /> Constraints: <br /> • The location of the Livermore Municipal Airport — noise and safety concerns will <br /> influence where development is appropriate. <br /> • Other existing land uses — the Pleasanton Garbage Service facility, the City's <br /> Operation Services Center and nearby quarrying operations will serve as <br /> constraints to some types of development. The possible relocation of the OSC <br /> and PGS site will be considered in the plan. <br /> • The Urban Growth Boundary — the UGB runs north to south along the future <br /> alignment of El Charro Road. Reconsideration of the location of this boundary in <br /> East Pleasanton was contemplated by the General Plan. <br /> • Areas of geotechnical concern — three areas towards the south of the Specific <br /> Plan area will require additional evaluation and re-engineering to support <br /> development. <br /> • Flood zone — a portion of the property to the north is within a 100-year flood <br /> zone. However, development of this site is likely feasible with flood <br /> improvements. <br /> Page 2 of 3 <br />