My WebLink
|
Help
|
About
|
Sign Out
09
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2013
>
011513
>
09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2013 12:21:22 PM
Creation date
1/8/2013 12:21:20 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
1/15/2013
DESTRUCT DATE
15Y
DOCUMENT NO
09
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The low bid of $498,603.30 was received from Caggiano General Engineering of El <br /> Dorado Hills, California. All bid documents were found to be in order and past work <br /> performed by this contractor was verified to be satisfactory. <br /> A project funding and estimated expenditure summary is included as Attachment 2. <br /> Note that the project contingency for the project is set at a higher rate (15%) in <br /> anticipation of existing underground utilities that may be in conflict with the water main <br /> and water lateral installations. The total cost of the project, including contingency, is <br /> $589,355. <br /> Schedule <br /> The anticipated schedule for the project is as follows: <br /> Approval of Plans and Specifications and Award of Contract January 15, 2013 <br /> Start of Construction February 2013 <br /> End of Construction May 2013 <br /> Submitted by: Fiscal Review: Approve y: <br /> Bria rf olan Emily agner Nelson Fialho <br /> Director of Director of Finance City Manager <br /> Community Development <br /> Attachments: <br /> 1. Bid Summary <br /> 2. Funding and Estimated Expenditure Summary <br /> Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.