Laserfiche WebLink
For Lot 6, the primary structure shall maintain a minimum 25-foot building <br />setback from the inside face of the sound wall adjoining Vineyard Avenue and <br />from the property line or the toe of the slope bank, whichever is greater from the <br />old Vineyard Avenue right-of-way. Accessory structures, excluding a swimming <br />pool/spa shall maintain a minimum 15-foot building setback. All other setback <br />requirements specified in Conditions 4.c. through 4.f. shall still apply to Lot 6. <br /> <br />Covered front porches attached to the main structure may come to a point no <br />closer than 12-feet from the front property line, provided that the covered front <br />porch is designed to be an integral part of the home, is open on three sides, has a <br />minimum depth of eight-feet, maintains the required 10-foot side yard, and has a <br />minimum width of 10-feet or covers 50-percent of the width of the wall that it is <br />located along, whichever is greater. The porch eaves shall project no more than an <br />additional 24-inches into the required front yard setback area. <br /> <br />The project subdivider shall pay any and all fees to which the project is subject to at the <br />time of any final map, said fees being those in effect at the time the map is filed for <br />approval. These fees shall include the Vineyard Avenue Corridor Specific Plan fees in <br />accordance with the provisions of the Vineyard Avenue Corridor Specific Plan Financing <br />program, except that should a final map be submitted which only creates Lot 6 as a <br />buildable lot, the Specific Plan fees collected with such a final map shall be for one lot <br />only. The remaining fees shall be collected at the time of the first final map creating any <br />of Lots 1-5. Individual lot/home builders shall pay any and all fees collected at the time a <br />building permit is issued at the rates in effect at the time of issuance of the building <br />permit. <br /> <br />The homebuilders shall show evidence of payment of the then-exiting Pleasanton Unified <br />School District school impact fee prior to issuance ora building permit. <br /> <br />Prior to issuance of a building permit, the project developer shall pay the applicable Zone <br />7 and City connection fees and water meter cost for any water meters, including irrigation <br />meters. Additionally, the project developer shall pay any applicable Dublin San Ramon <br />Services District (DSRSD) sewer permit fee. <br /> <br />This development plan shall be of no further validity and the project developer shall be <br />required to submit the same or new development plan for City approval prior to <br />development of the site in the event that the project developer fails to record a final map <br />within two years of this PUD Development Plan approval. Portions of the development <br />plan not covered by a final map within two years will have the development plan lapse as <br />to that portion of the project. <br /> <br />The project developer acknowledges that the City of Pleasanton does not guarantee the <br />availability of sufficient sewer capacity to serve this development by the approval of this <br /> <br />Final Conditions (Corrected) March 4, 2003 Page 3 of 22 <br /> <br /> <br />