BACKGROUND <br /> The Sidewalk Maintenance project is an annual City program. The City's Streets <br /> Division identifies sidewalk areas that are potential tripping hazards and the City's ADA <br /> (Americans with Disabilities Act) Compliance Committee recommends locations for <br /> improvements. The City of Pleasanton's Engineering Division considers safety <br /> improvement, priority, proximity to other locations requiring work, scheduling of other <br /> street projects, and available budget when prioritizing locations to be improved each <br /> year. <br /> This project consists of removing and replacing 7,990 SF of sidewalk that presents <br /> potential tripping hazards, 70 LF of curb and gutter that has cracks and drainage <br /> problem and installing 12 new intersection ramps for ADA accessibility near sidewalk <br /> repairs. This year's improvements will take place near Civic Park and the surrounding <br /> areas, Hansen Drive, Hopyard Road between Valley Avenue and Hansen Drive and <br /> Division Street near Del Valle Parkway. <br /> DISCUSSION <br /> Bids <br /> The engineer's estimate for the project was calculated at $95,000. Sealed bids were <br /> opened on October 9, 2012. Six bids were received that ranged from $95,301 to <br /> $181,734 (see Attachment 2). The low bid was received from Nor-Cal Concrete <br /> Company, Inc. of Suisun, California. All bid documents were found to be in order and <br /> past work performed by Nor-Cal Concrete was verified to be satisfactory. Staff <br /> recommends award of the construction contract to the lowest responsible bidder, Nor- <br /> Cal Concrete Company, Inc. <br /> Budget <br /> Staff recommends that the contingency amount for this project be set at 15% of the <br /> construction contract due to potential expansion of project limits due to defects that may <br /> become apparent during the demolition phase. A summary of funding arid estimated <br /> expenditures is presented in Attachment 3. <br /> Schedule <br /> The proposed schedule for the project is as follows: <br /> Approval of Plans and Specifications/Award of Contract November 20, 2012 <br /> Start of Construction January 2012 <br /> End of Construction March 2012 <br /> Page 2 of 3 <br />