My WebLink
|
Help
|
About
|
Sign Out
ORD 1007
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
1001 - 1100
>
ORD 1007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2004 12:34:59 PM
Creation date
3/23/1999 5:54:37 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT NO
ORD 1007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
37. That the developmen.t pay to the City, on a half street <br /> developed frontage basis, the co~t 6f slurry sealing <br /> and restriping or cause the work to be performed to <br /> restore the adjacent streets to preconstruction <br /> conditions at 'the option of the City Engineer. <br /> <br />.. 38~ That the' developer comply ~,~ith any and all applicable <br /> requirements of the cross connections control and' <br /> and backflow prevention device programs required .by <br /> California Administrative Code, Title 17o <br /> <br /> 39. That. the developer pay the ~ applicable Zone 7..and 'City <br /> connection fees and the meter cost prior to building <br /> permit approval of the development for any ~al-ter meters <br /> (irrigation meters) not directly related to a building' <br /> permit. <br /> <br /> 40. That the developer submit a dust control plan as part <br /> of the improvement plans prior to~approva! of the final <br /> map. <br /> <br /> 41. That detailed plans for all utility boxes and existing <br /> facilities be included as part of the improvement plans <br /> for review and approval. <br /> <br />-. 42. That the developer submit detailed on-si~e and off-site <br /> landscape and irrigation plans to the Planning Division <br /> for approval as part of t. he improvemen'~-- plans. These <br /> pla. ns should provide for landscaping and irrigation. <br /> These plans shall be submitted pr].or tO issuance of a <br /> building permit. <br /> <br /> 43. That the developer submit a refundable cash bond <br /> hazard control for each site prior to issuance of <br /> building permits. The amount 'of this bond will be <br /> determined by the City Engin. eer ($2500 ma~:imum). <br /> <br /> 44. That electric power distribution, gas distribution, <br /> communication service, and any required alarm systems <br /> be installed underground in a joint utility- trench <br /> unless otherwise specifi6ally approved ~y '~he City <br /> Engineer. <br /> .i <br /> <br /> 45° That 'the developer contribute his proportionate share <br /> of the cost of the traffic signal proposed to be installed <br /> at the intersection of First: .Street, Pico Avenue and <br /> Barhal Avenue. The amount of this contribution shall be <br /> determined by 'the City after discussions with the <br /> developer and paid by -the deve].oper prior to issuance <br /> of any building permits. <br /> <br /> -5- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.