My WebLink
|
Help
|
About
|
Sign Out
05
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2012
>
101612
>
05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2012 2:28:12 PM
Creation date
10/10/2012 2:28:12 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
10/16/2012
DESTRUCT DATE
15Y
DOCUMENT NO
05
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACKGROUND <br /> The Sidewalk and Intersection Ramp Installations project is an annual City program. <br /> The City's ADA Compliance Committee identifies and recommends locations for <br /> improvements that do not meet current ADA standards for existing crosswalk areas. <br /> The City of Pleasanton's Engineering Division considers priority, proximity to other <br /> locations requiring work, scheduling of other street projects, and available budget when <br /> selecting locations to be improved each year. <br /> This year's project consisted of: removing and replacing five pork chop islands along <br /> Hopyard Road; installing nine new ramps along Inglewood Drive and Del Valle <br /> Parkway; removing and replacing damaged sidewalks that are potential tripping <br /> hazards, and curb and gutter that either has cracks or drainage problems at various <br /> locations in the City. Additionally, the project included work by the City's on-call traffic <br /> signal maintenance contractor, AEGIS ITS, Inc., to modify pedestrian push buttons at <br /> pork chop islands to meet current ADA standards. <br /> On May 1, 2012, Pleasanton's City Council awarded the contract to the lowest <br /> responsible bidder, JJR Construction, Inc., in the amount of$83,598. Council authorized <br /> the Director of Community Development to approve change orders up to the project <br /> contingency amount of$16,720. The project has since been completed and is ready for <br /> acceptance. <br /> Budget <br /> Funding for the project was provided in the Annual Sidewalk and Intersection Ramp <br /> Installations Project, CIP 115005. Change orders totaling $11,406.02 were due to <br /> expansion of project limits and additional requests from the Streets Division during <br /> construction. AEGIS ITS, Inc. installed pedestrian push buttons for a cost of $6,249. A <br /> summary of the project's funding sources and expenditures is presented in <br /> Attachment 1. <br /> Submitted by: Fiscal Review: Approve y: <br /> Brian Dolan Emily Wa•'ler Nelson Fialho <br /> Director of Director of Finance City Manager <br /> Community Development <br /> Attachments: <br /> 1. Funding and Expenditure Summary <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.