My WebLink
|
Help
|
About
|
Sign Out
05
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2012
>
090412
>
05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2012 11:57:08 AM
Creation date
8/30/2012 11:57:00 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/4/2012
DESTRUCT DATE
15Y
DOCUMENT NO
05
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WORKPLAN <br /> Scenario 3: Existing Plus Approved Projects (EPAP) No Project Conditions <br /> —Existing volumes plus traffic estimates for approved developments and/or <br /> traffic increases due to regional growth. Regional roadway system <br /> improvements for this scenario,if any,will be confirmed with City staff. <br /> Scenario 4a: EPAP Plus Project(Optional Task)—Traffic volumes from <br /> Scenario 3 plus traffic estimated for the project. The roadway system is the <br /> same as Scenario 3 (no extension of El Charro Road). <br /> Scenario 4b: EPAP Plus Project Plus El Charro Road Extension—Land uses <br /> consistent with Scenario 4a,but considers traffic patterns wi:h construction <br /> of the El Charm Road extension. <br /> Scenario 5: EPAP Plus Pending Projects No Project Conditions—Traffic <br /> from Scenario 3,plus traffic from anticipated projects (projects not yet <br /> approved or included in the travel demand model but likely to be approved in <br /> the near-term) identified by City staff,including proposed, bat not yet <br /> approved development on the CarrAmerica site and at the Fast Pleasanton <br /> BART station. Roadway improvements to assume in this scenario will be <br /> discussed with City Staff. <br /> Scenario 6a: EPAP Plus Pending Projects Plus Project (Optional Task)— <br /> Traffic volumes from Scenario 5 plus traffic estimated for the project. The <br /> roadway system is the same as Scenario 5 (no extension of El Charro Road). <br /> Scenario 6b: EPAP Plus Pending Projects Plus Project Plus El Charro Road <br /> Extension—Land uses consistent with Scenario 6a, but evaluates traffic <br /> patterns with construction of the El Charro Road extension. <br /> Scenario 7: Far-Term (Cumulative) No Project Conditions—Projected traffic <br /> volumes and the projected roadway system using the City of Pleasanton <br /> Travel Demand Model.The traffic forecasts include Approved and Pending <br /> projects from Scenarios 3 and 5,in addition to build out of land uses <br /> consistent with the General Plan and adopted Housing Element. Roadway <br /> improvements to assume in this scenario will he discussed with City Staff. <br /> Scenario 8: Far-Term (Cumulative) Project Conditions—Traffic volumes <br /> from Scenario 7 plus changes from development of the Project.This scenario <br /> would assume that El Charro Road would be extended all the way through <br /> the site. <br /> Mitigation measures will be identified for impacts that exceed the thresholds <br /> established in the significance criteria. The project's proportionate share of <br /> identified intersection and roadway improvements will be calculated. <br /> Site Plan and Parking Review <br /> Fehr&Peers will perform a detailed site plan review from a CEQA <br /> perspective,drawing from the analysis conducted under Phase 1. It is <br /> anticipated that the plan would be self-mitigating in terms of access, parking, <br /> circulation,alternative mode accommodation and parking,and that potential <br /> issues would have been addressed in the development of the Specific Plan. <br /> Congestion Management Agency Assessment <br /> GATES <br /> MSSCCIATIS <br />
The URL can be used to link to this page
Your browser does not support the video tag.