My WebLink
|
Help
|
About
|
Sign Out
08
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2012
>
082112
>
08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2012 11:17:15 AM
Creation date
8/14/2012 2:14:33 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
8/21/2012
DESTRUCT DATE
15Y
DOCUMENT NO
08
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Irrigation and Landscaping Improvements at El Charm Road and the I-580 Interchange I CEP 115023) <br /> July 31, 2012 <br /> Page 5 <br /> L. Erosion control is assumed to be covered by the proposed landscape improvements and will <br /> not be designed/provided by the Civil Engineer. <br /> M. Design of construction documents (sheets) will be conducted in AutoCAD 2010 format. <br /> Layering/plotting will be per Caltrans CADD Standards. <br /> N. The following will be provided by others: <br /> - Planimetric Mapping in AutoCAD format <br /> - Supplemental Survey(Topo) if Required <br /> - Geometric basefiles of Roadway(Parent) Project for design basis in AutoCAD format <br /> - All permit/application fees,including (but not limited to) the Caltrans encroachment <br /> permit application fee . <br /> - Printing services for PS&E submittals and advertisement <br /> - One (1) submittal to Caltrans <br /> O. Exclusions: <br /> The following services/tasks are excluded from this scope and fee,but can be provided as <br /> additional work contingent upon authorization of an approved amendment: <br /> - As-Built (Post Construction) Services <br /> - Utility Relocation and New Services/Design <br /> - Construction Staking <br /> - Traffic Control/Stage Construction/Detour Sheets <br /> - Erosion Control <br /> - Traffic Management Plan and Reports <br /> - Exception Reports, including (but not limited to) Mandatory/Advisory Design and <br /> Longitudinal Utility Encroachment Exceptions <br /> - MVP,CUP,or other Ramp Improvements <br /> - Lighting or Signal Design <br /> - Non-Standard Special Provisions (nSSPs) <br /> - Storm Water Data Report (SWDR) <br /> - Design Team Project Administration/Management <br /> - Right of Way Engineering and/or Documents <br /> - PS&F./RTL Documents (Certs,RE File,Survey File Etc) <br /> - Additional submittals beyond the 3 assumed(65%, 100%, and Final) <br /> - Storm Drainage Design and Calculations <br /> - Storm Water Mitigation/BMPs <br /> - Preparation of front end specifications. <br /> - Additional site visits and meetings. <br />
The URL can be used to link to this page
Your browser does not support the video tag.