My WebLink
|
Help
|
About
|
Sign Out
06
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2012
>
082112
>
06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2012 11:17:15 AM
Creation date
8/14/2012 2:10:42 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
8/21/2012
DESTRUCT DATE
15Y
DOCUMENT NO
06
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE CITY OF 6 <br /> " -'-� CITY COUNCIL AGENDA REPORT <br /> pL£ASANTONo <br /> August 21 , 2012 <br /> Community Development <br /> Traffic Engineering Division <br /> TITLE: APPROVE PLANS AND SPECIFICATIONS, REVIEW BIDS, AND AWARD <br /> CONSTRUCTION CONTRACT TO TIM PAXIN'S PACIFIC EXCAVATION, <br /> INC. IN THE AMOUNT OF $694,644 FOR TRAFFIC SIGNAL <br /> INSTALLATIONS ON STONERIDGE DRIVE AT NEWTON WAY, GUZMAN <br /> PARKWAY AND TREVOR PARKWAY, CIP NO. 115036 <br /> SUMMARY <br /> Bids have been received for the project and staff recommends award of the construction <br /> contract to the lowest responsible bidder, Tim Paxin's Pacfic Excavation, Inc. in the <br /> amount of $694,644. The work consists of installing three traffic signals, signing and <br /> striping, traffic signal interconnect, curb ramp modifications and other minor civil <br /> improvements on Stoneridge Drive at Newton Way, Guzman Parkway, and Trevor <br /> Parkway. <br /> RECOMMENDATION <br /> 1. Approve the plans and specifications for the project. <br /> 2. Review the bids and award the construction contract to Tim Paxin's Pacific <br /> Excavation, Inc. of Elk Grove, California, for a low bid amount of $694,644. <br /> 3. Authorize the City Manager to enter into the above construction contract. <br /> 4. Authorize the City Engineer to approve and execute contract change orders for a <br /> contingency amount not to exceed $69,464 (10% of construction bid), if necessary, <br /> for related project work. <br /> FINANCIAL STATEMENT <br /> There will be an increase in annual operations and maintenance costs due to the <br /> additional signalized intersections in the City. Project construction is fully funded and is <br /> included in the FY 2012/13 Capital Improvement Project (CIP). A budget summary is <br /> attached (Attachment 1). <br />
The URL can be used to link to this page
Your browser does not support the video tag.