My WebLink
|
Help
|
About
|
Sign Out
ORD 0975
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
0901 - 1000
>
ORD 0975
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2004 12:26:50 PM
Creation date
3/23/1999 4:54:33 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT NO
ORD 0975
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
17. That the developer shall agree to pay his fair share of <br /> an economic analysis that is being done for other <br /> business parks being proposed in Pleasanton. Total <br /> cost of said analysis to range in price between <br /> $5,000 and $20,000. <br /> <br />18. That there shall be a bicycle/ped path constructed within <br /> -the landscape area along the Valley Avenue and Bernal <br /> Avenue frontages of the subject property. <br /> <br />19. That if the San Francisco Water Department property <br /> does not become part of the project and the interior <br /> loop road is eliminated, that portion of the exterior <br /> loop road which runs through that property shall be <br /> redesigned to either cul-de-sac or hammerhead on <br /> ~ither side of the San Francisco property, said <br /> redesign to be shown on the tentative map. <br /> <br />20. That. all areas of native vegetation disturbed as a <br /> result of development on the subject property shall be <br /> replanted with native drought resistant vegetation, <br /> including larger slower growing trees seldom planted <br /> by developers(sycamore, valley oak, blue oak and <br /> coast live oak). <br /> <br />21. That in order to reduce erosion and grading, land <br /> preparation should be restricted to the period of <br /> April to November and all errodable slopes shall be <br /> hydromulched or otherwise stabilized by NOvember 15th <br /> (this will reduce deposition of sediments and chances <br /> of degrading water quality in surrounding creeks). <br /> <br />22. That temporary sediment retention basins shall be <br /> provided in the design of the development to the <br /> satisfaction of the City Engineer. Maintenance of <br /> these retention basins should be ensured throughout <br /> the full construction of the project. Oil and grease <br /> traps shall be utilized on site to catch grease and <br /> oil. <br /> <br />23. That since the development plan does not show the <br /> specific design of buildings to be constructed on <br /> the property, all buildings and individual site, <br /> landscaping and parking shall require approval <br /> by the Design Review Board prior to issuance of <br /> building permits. <br /> <br /> -3- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.