Laserfiche WebLink
Development. The location of the stations shall be subject to the review and approval of the <br /> Director of Community Development prior to building permit issuance. <br /> 48. The applicant/project developer shall work with staff on locations for providing light-colored paving <br /> material for internal streets and parking areas. The color and location of the paving shall be <br /> shown on the plans submitted to the Building and Safety Division and shall be subject to the <br /> review and approval of the Director of Community Development prior to building permit issuance. <br /> 49. The applicant and/or project developer shall incorporate solar tubes, skylights, and/or other <br /> daylighting systems, subject to the satisfaction of the Director of Community Development, within <br /> the design of the leasing building and club/fitness building. The method used and plan details <br /> shall be incorporated into the plans submitted to the Building and Safety Division for plan check <br /> and shall be subject to the review and approval of the Director of Community Development prior to <br /> building permit issuance. <br /> 50. The applicant and/or project developer shall develop a program for grey water systems for the <br /> subject site to the satisfaction of the Director of Community Development. The program shall be <br /> subject to the review and approval of the Director of Community Development prior to building <br /> permit issuance. <br /> 51. Rain gutters shall discharge into landscaping planter areas where feasible. These details shall be <br /> shown on the plans submitted to the Building and Safety Division for plan check and are subject to <br /> the review and approval of the Director of Community Development prior to building permit <br /> issuance. <br /> Engineering Division <br /> 52. The typical street sections shall be revised to indicate the street or streets represented <br /> by the street-section. The sections with the bioretention swales adjacent to the street shall be <br /> modified to show the swales and how storm water will enter the swale from the street. <br /> Additionally, the street section with the trail shall be modified to show the location of the trail <br /> relative to the street section. <br /> 53. The streets within the development shall be private and maintained by the owner. As <br /> such, the owner shall dedicate to the City an emergency vehicle access easement over these <br /> private streets. <br /> 54. The on-site utilities shall be private and maintained by the owner. As such the Public <br /> Service Easement (PSE), Waterline Easement (WE), Sanitary Sewer Easement (SE), and Storm <br /> Drain Easement(SD) shall be removed from future plan submittals to the City of Pleasanton. <br /> 55. Unless otherwise approved by the City Engineer, the proposed entrance off Hacienda <br /> Drive shall be increased to 26-feet. <br /> 56. Any proposed driveways, street lights, street signs or sidewalks along Gibraltar Drive or <br /> Hacienda Drive shall be privately maintained and meet Hacienda guidelines. <br /> 57. The applicants' engineer/surveyor shall prepare all plots and descriptions' for the City to <br /> abandon portions of the City street right of way and/or Public Service Easements. Said plots and <br /> descriptions' shall be submitted to the City before a grading permit is issued for the site. <br /> 58. The sidewalks at the entrance street of Gibraltar Drive or Hacienda Drive shall be <br /> redesigned such that the ramp for the handicapped intersects the midpoint of the curb return, <br /> unless otherwise approved by the City Engineer. <br /> PUD-81-30-86D and P11-0856 Hacienda TOD Site 2, BRE <br /> Conditions of Approval 6 of 24 Mixed-Use Development <br />