My WebLink
|
Help
|
About
|
Sign Out
ORD 2036
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
2001 - 2100
>
ORD 2036
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:22:02 PM
Creation date
5/7/2012 3:21:55 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
5/1/2012
DESTRUCT DATE
PERMANENT
DOCUMENT NO
ORD 2036
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORD 2036 <br /> EXHIBIT A-2 <br /> CONDITIONS OF APPROVAL <br /> PUD-81-30-86D and P11-0856/Site 2, BRE Properties <br /> Mixed Use Development Project <br /> April 17, 2012 <br /> PROJECT SPECIFIC CONDITIONS <br /> Planning Division <br /> 1. Revised plans related to the depth of live/work spaces, dated "Received, March 27, 2012," on file <br /> with the Planning Division, shall be further revised to reflect a live/work depth of 38-feet for <br /> "Garden Building 4." The setback for"Garden Building 4" shall be a minimum of 30-feet from the <br /> curb on Gibraltar Drive. The applicant shall submit elevations and exhibits to the satisfactory of <br /> the Director of Community Development demonstrating how the extended first floor spaces <br /> integrate with overall architectural design. These revisions shall be subject to the review and <br /> approval of the Director of Community Development prior to building permit issuance. <br /> 2. The subject property is zoned Planned Unit Development — Mixed Use (PUD-MU) District. The <br /> permitted and conditionally permitted uses on the subject property shall be those listed on page 13 <br /> of the Hacienda TOD Standards and Design Guidelines. <br /> 3. The development plan (Case No. PUD-81-30-86D) and the Phase I and Phase II Development <br /> Agreement Amendments (Case No. P11-0856) shall expire five years from the effective date of <br /> this ordinance unless a building permit is issued and construction has commenced and is diligently <br /> pursued. <br /> 4. At the time a building permit is issued, the development approved with this PUD development plan <br /> will replace the assigned Hacienda office and commercial square-footage capacity for this site. <br /> 5. The applicant and/or developer shall submit a pad elevation certification prepared by a licensed <br /> land surveyor or registered civil engineer to the Chief Building Official and Director of Community <br /> Development certifying that the pad elevations and building locations (setbacks) are pursuant to <br /> the approved plans, prior to receiving a foundation inspection for the structures. <br /> 6. The applicant/project developer shall work with the Planning Division to increase the amount of <br /> building caps visible from the interior of the project. <br /> 7. The final design of the patio walls and balcony materials shall be subject to the review and <br /> approval of the Planning Division prior to building permit issuance. <br /> 8. The applicant shall construct 8-foot of paved area and 2-foot of landscaping for the proposed trail <br /> along the northwest and east sides of Site 2. These improvements shall be shown on the plans <br /> submitted to the Building and Safety Division for plan check and permit issuance. The design of <br /> the trail improvements shall be subject to the review and approval of the Director of Community <br /> Development prior to building permit issuance. <br /> 9. The plan shall be revised to reflect internal residential pedestrian access to the trail for Site 2. This <br /> revision shall be subject to the review and approval of the Director of Community Development <br /> and shall be incorporated into the plans submitted to the Building and Safety Division for permit <br /> issuance. <br /> 10. This approval does not guarantee the availability of sufficient water capacity to serve the project. <br /> Prior to the recordation of a Final Map, issuance of a grading permit, issuance of a building permit, <br /> or utility extension approval to the site, whichever is sooner, the applicant shall submit written <br />
The URL can be used to link to this page
Your browser does not support the video tag.