My WebLink
|
Help
|
About
|
Sign Out
10
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2012
>
032012
>
10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2012 3:19:28 PM
Creation date
3/13/2012 3:19:27 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
3/20/2012
DESTRUCT DATE
15Y
DOCUMENT NO
10
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposed Projects <br /> The following is a list of City projects that could be evaluated by Honeywell through an <br /> investment grade audit for an energy performance contract: <br /> • HVAC upgrades and controls at appropriate City facilities <br /> • Lighting upgrades to City Facilities <br /> • Street, Park, and Parking lot lighting upgrades to LED or appropriate technology <br /> • Solar/ renewable energy upgrades at appropriate facilities <br /> • Retrofit of water meters to automated technology <br /> • Retrofit of City facilities with water conservation devices <br /> • Fleet replacement program <br /> • Upgrade of utility infrastructure pumps, control systems, to maximize energy <br /> efficiency <br /> This comprehensive list of projects will position the City to reduce operating costs long <br /> term and to reduce green house gases in compliance with our Climate action plan goals. <br /> Proposed Schedule <br /> The following is the proposed schedule for Honeywell to undertake the investment grade <br /> audit on the selected City projects: <br /> March 2012 Begin investment-grade audit <br /> April 2012 Workshop to review/select final measures to be implemented <br /> May 2012 Present plan to City Council (measures, savings/revenue, financing) <br /> June 2012 Begin implementation of selected measures <br /> Sub eeby: / Reviewed by: Approvedd^by:/ <br /> �� <br /> Daniel Sr ith Emily Wagner Nelson Fialho <br /> Director Operations Services Finance Director City Manager <br /> Attachment: <br /> 1. Draft Letter of Intent <br /> Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.