My WebLink
|
Help
|
About
|
Sign Out
RES 12502
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2010-2019
>
2012
>
RES 12502
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/29/2012 12:13:00 PM
Creation date
2/29/2012 12:12:55 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
2/21/2012
DESTRUCT DATE
PERMANENT
DOCUMENT NO
RES 12502
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.5 After completion of the Bridge Improvements, City shall obtain an <br /> encroachment permit from Zone 7 prior to making any major additions or modifications or <br /> reconstruction of the Bridge Improvements upon the property of Zone 7 as well as any <br /> associated Channel maintenance activities. City shall provide plans for review and approval <br /> prior to making any major additions or modifications or reconstruction of said Bridge. Zone 7 <br /> shall, upon review and approval of plans, issue said permit within three (3) working days, if <br /> possible, at no cost to City. <br /> 1.6 City agrees that upon the completion of any of its work within Zone 7's <br /> property, to restore Zone 7's property to the condition in which it was prior to the <br /> commencement of said work or as acceptable to Zone 7. City shall, at City's sole cost, <br /> promptly repair any damage to Zone 7's real and personal property, arising out of or in <br /> connection with City's construction, operation, maintenance, replacement, repair or removal of <br /> the Bridge Improvements as well as any associated Channel maintenance activities. In the <br /> event after written notice is provided by Zone 7, the City fails, is unable or refuses to maintain <br /> or repair its Bridge Improvements or Channel within the Easement Area, or to otherwise take <br /> action(s) necessary to protect Zone 7's real and personal property from damage, Zone 7 shall <br /> have the option to perform any necessary work to protect its property from damage or to <br /> maintain, repair, alter or replace Zone 7's property damaged due to City's lack of or failure to <br /> maintain or repair its Bridge or to take action to protect Zone 7's property . City shall be <br /> responsible for any costs incurred by Zone 7 in connection therewith and shall promptly <br /> reimburse Zone 7 upon receipt of written invoice. <br /> 2. Maintenance Responsibilities: <br /> 2.1 Bridge: The City, at its cost, shall be solely responsible for the <br /> maintenance and repair of the Bridge Improvements including those which are a result of any <br /> damages from storm flows, slides and other causes. <br /> 2.2 Channel Area: City, at its cost, shall be responsible for periodic <br /> inspection of the Channel and the prompt removal of litter, fallen trees, vegetation and debris <br /> that may obstruct the flow of water or lead to scouring or erosion of the Channel within the <br /> Easement Area, excepting the desilting of the channel. <br /> 2.3 Channel Slopes. City shall further be responsible for maintaining or <br /> repairing the channel slopes and any roadways damaged from Channel scouring or erosion <br /> within the Easement Area. Such maintenance and repairs shall include the responsibility to <br /> obtain any regulatory approvals and comply with all applicable permits issued including: US <br /> Army Corps of Engineers, State Water Resources Control Board and California Department of <br /> Fish and Game. <br /> 3. Reserved Rights of Zone 7: <br /> 3.1 Zone 7 reserves the right to convey easement rights to others so long as <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.