My WebLink
|
Help
|
About
|
Sign Out
08
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2012
>
022112
>
08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2012 1:40:26 PM
Creation date
2/14/2012 1:40:17 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/21/2012
DESTRUCT DATE
15Y
DOCUMENT NO
08
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
View images
View plain text
THE CITY OF <br /> pL£ASANTON. <br /> Mitigation Activities and Priorities <br /> Evaluation of Progress from 2005 Plan <br /> In 2005, mitigation actions and priorities were identified. The following list indicates each of the <br /> strategies identified, along with responsible department or agency, action taken, and current <br /> status. In this section, the strategies have been listed according to their current status of <br /> completed, deferred, or under study. <br /> Completed Strategies <br /> • Investigate the use of phone-based warning systems for selected geographic areas. LPFD <br /> Emergency Preparedness. Upgraded emergency notification system 2011. (GOVT-b-22); <br /> Deferred Strategies <br /> • Tie public education on defensible space and a comprehensive defensible space ordinance to <br /> a field program of enforcement. LPFD Fire Prevention. Resource shortage. (HSNG-g-2); <br /> Under Study <br /> • Install micro and/or surveillance cameras around critical public assets tied to web-based <br /> software, and develop a surveillance protocol to monitor these cameras. Pleasanton Police <br /> Dept., (GOVT-a-6). <br /> Future Mitigation Actions and Priorities <br /> As a participant in the 2010 ABAG multi-jurisdictional planning process, the staff of the City of <br /> Pleasanton and the Livermore-Pleasanton Fire Department (LPFD) helped in the development <br /> and review of the comprehensive list of mitigation strategies in the overall multi-jurisdictional <br /> plan. The decision on priority was made based on a variety of criteria, not simply on an <br /> economic cost-benefit analysis. These criteria include being technically and administratively <br /> feasible, politically acceptable, socially appropriate, legal, economically sound, and not harmful <br /> to the environment or our heritage. Representatives from multiple departments then met on a <br /> regular basis to review progress on the City's 2005 strategies, to identify and prioritize additional <br /> mitigation strategies to update the list <br /> The City's planning team reviewed the list of recommended mitigation strategies. As part of the <br /> review, the City team identified existing programs and activities which are ongoing programs. <br /> This list includes the responsible department/agency, comments (if needed), and related <br /> mitigation strategy number. The ongoing programs in the following section encompasses <br /> activities that address our future mitigation strategies. <br /> 2010 Local Hazard Mitigation Plan Annex 13 September 1, 2011 <br /> City of Pleasanton <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).