Laserfiche WebLink
<br />Commissioner Pentin stated that he would like to see more specific details on the <br />connection to the Iron Horse Trail, whether there will be gates, whether it will be open, <br />and the type of access across the parking lots to get to the trail. <br /> <br />Commissioners O <br /> <br />Chair Narum stated that she would like to see a visual of the tot lot on Site 1. She noted <br />that the packet only shows the area where it is to be located; there is nothing that shows <br />the details or the angle across the tot lot. <br /> <br />Mr. Linder replied that they have not designed these space amenities yet but could <br />bring back images of the types of tot lots they have built on other sites which they still <br />own and manage, as well as a conceptual picture of what their typical tot lots look like. <br />He added that they are open to suggestions if there is something the Commission would <br />like to see in the tot lots. <br /> <br />Chair Narum indicated that she would like to see one kind of view across the tot lot. <br />She added that a picture of a typical tot lot showing what they would do would also be <br />good. <br /> <br />Mr. Linder replied that they can do both. <br /> <br />Chair Narum asked the applicants if they had any questions or needed further <br />clarification on Site 1. <br /> <br />Mr. Linder replied that there were none at this time. He stated that it is pretty clear and <br />in line with what Mr. Dolan and staff have already requested of them. <br /> <br />Site 2 Discussion Items: <br /> <br />A. Would the Planning Commission support exceptions (items 1 through 13 <br />noted in the staff report) to the Hacienda TOD Standards and Guidelines if the <br />project were to move forward as proposed? <br /> <br />Commissioner Pentin stated that he has the same answer as on Site 1: he would like <br />see the entryway -more like a street; he does not have problems with <br />the alley because he does not want to lose more open space; and he is fine with the <br />approximately 30-foot depth on the live/work. <br /> <br />comments. <br /> <br />Mr. Yau stated that the main entry on Site 2 will be off of Gibraltar Drive, which will have <br />a 26-foot wide drive entry and the landscape setback required by the TOD Guidelines. <br />He noted that the entry off of Hacienda Drive will not be 26 feet wide. He added that <br />PLANNING COMMISSION MINUTES, October 17, 2011 Page 23 of 36 <br /> <br />