My WebLink
|
Help
|
About
|
Sign Out
ORD 0954
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
0901 - 1000
>
ORD 0954
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2004 12:22:32 PM
Creation date
3/23/1999 4:20:13 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT NO
ORD 0954
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Finding: Specific economic, social, and environmental con- <br /> siderations make infeasible the continued use of the <br /> existing route ("no project" alternative). <br /> Facts: See below for the beneficial impacts. Also note that <br /> the existing route suffers unacceptable noise levels <br /> which would be significantly reduced whereas increases <br /> in ambient levels along the North Livermore Avenue route <br /> would be unnoticeable. <br /> <br />SUMMARY OF BENEFICIAL IMPACTS <br /> <br />1. Decrease in gravel truck - pedestrian-bicycle-auto conflicts. <br /> <br />2. Improved level of service at signalized Ray-Vineyard-First <br /> intersection. <br /> <br />3. Postponement of major repairs on Stanley-First-Sunol <br /> corridor and extension of street life. <br /> <br />4. Decrease in noise level along existing corridor bene- <br /> fitting both residents and school operations. <br /> <br />5. Reduction in localized pollutants along existing corridor, <br /> particularly dust. <br /> <br />6. Growth inducement for commercial development along <br /> existing route. <br /> <br />7. Reduction in vehicular accidents along existing route. <br /> <br />8. Elimination of hazards/pollution of parked and/or idling <br /> trucks along existing route. <br /> <br />STATEMENT OF OVERRIDING CONSIDERATIONS <br /> <br />The beneficial effects of the project summarized above, especially <br />when seen in the content of some 50+ years of remaining life of <br />the quarries, clearly outweigh the significant environmental <br />effects of the project. <br /> <br /> -5- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.