Laserfiche WebLink
6 Mitlgellon monitoring and Reporting Program <br /> TABLE 6-1(Continued) <br /> MITIGATION MONITORING AND REPORTING PROGRAM <br /> Site(s) Implementation Monitoring Monitoring and Reporting Monitoring Verification of <br /> Mitigation Measures Affected Procedures Responsibility Action Schedule • Compliance <br /> accordance Mtn the procedures and requirements set Myth in The project applicant will verification. Inspect site during on construction Dare: <br /> Calilonia Health and Safety Code Section 7050.5 and Public halt want and notify the constriction to ensure drawings. <br /> Resources Section 509198.These code provisions require County Coroner,if compliance with project <br /> notification of the County Carver and the Native American Field inspections <br /> necessary.If appropriate, construction plans. during <br /> Heritage Cmely descended m who h t must notify the persons believed Coroner shall notify NAHC. construction. <br /> to be most likely descended from the deceased Native American for NAHC shall notify Most <br /> appropriate c isposibon of the remains. Likely Descendant. <br /> • <br /> This measure will be panted <br /> on all construction <br /> documents,contracts,and <br /> project plans. <br /> G.Hazards aad Hazardous Materials <br /> Mitigation Measure 4.G-2:The City shell ensure that each i Al Project appicant will prepare Community Review of Phase 1 and if Prior to issuance Verified by: <br /> project applicant retain a qualified environmental consulting firm a Phase!environmental Development remediatlon is required, of construction <br /> to prepare a Phase I environmental site assessment in assessment to ensure which i Department review verification. and grading I <br /> accordance with ASTM E1527-05 which would ensure that the adheres to all specifications permit(s). Dare: <br /> City Is aware of any hazardous materials on the site and can in this measure, whichever is <br /> • <br /> require the right wane of action.The Phase I shall determine if the Phase 1 determines <br /> the presence of recognized environmental conditions and <br /> • <br /> provide recommendations for further Investigation.if applicable. that Fuller investigation and <br /> Prior to receiving a building or grading permit.project applicant rerediation is needed,the <br /> shall provide documentation from overseeing agency(e.g., project applicant will provide <br /> ACEM or RWOCB)that sites with identified contamination have verification from overseeing <br /> been remediated to levels where no threat to human health or agency that sites with <br /> the environment remains for the proposed uses. I identified contamination <br /> have been reme0iated to <br /> levels where no threat to I <br /> human health or the <br /> environment remains for the <br /> proposed uses. <br /> Mitigation Measure 4.G-S: a.8.8. Project applicant cog submit Community Verify information Verity and Verified by <br /> a. Prior to PUD approval for Sites 11(lGawa),14(Legacy 10,11, information which Development submitted.Forward forward prior to <br /> Partners).B(approval for Site,8(1 0 de Mau4(iegecyxk).10 14,16, demonstrates compliance Department— information to ALUC. PUD approval or <br /> 17,21 with ALUPP. verification and use permit <br /> (CarrA erin),18(Vintage Hills Shopping Center).17(Ave i forwarding of approval as Dare: <br /> Community Heath),and 21(4202 Stanley):1)the aajeCt information applicable. <br /> appti®nt shall submit information to the Director of Community I Require condition <br /> when compliance with the ALUPP,as i b.11 and Forward information to Include condition— when PUD is <br /> apptcade,including its height guidance;and 2)the Director of . t4 ALUC as described. City of Pleasanton reviewed. • <br /> Comnamty Development shall forward this information and the i c.All Include conditions as City Council. <br /> aoposed PUD development plan to the ALUC for review. described. <br /> D. Pnorto- use p-, ice Saes 11 Jewel and 14 <br /> Camel Pte/amendment and Reams 6-10 ESA:210015 <br /> Feel Supplemental Environmental ier'.d Report Detente(2011 <br />