Laserfiche WebLink
If project activities will occur during the non-breeding season (September 1 <br /> through January 31), a second pre-construction survey shall be conducted for <br /> burrowing owl to document wintering owls that have migrated to the project site, <br /> as well as breeding owls that may have left the project site. If owls are not <br /> detected during this survey, project work can move forward as proposed. <br /> If occupied burrows are detected during this survey and can be avoided, project <br /> activities shall not occur within 160 feet of occupied burrows. <br /> If occupied burrows cannot be avoided, one-way doors shall be installed to <br /> passively relocate burrowing owls away from active work areas. Two natural <br /> burrows or one artificial burrow shall be provided in adjacent grassland habitat for <br /> each one-way door installed in an active burrow. One-way doors shall remain in <br /> place for 48 hours. The project site shall be monitored daily for up to one week to <br /> ensure owls have moved to replacement burrows. <br /> Once unoccupied, burrows shall be excavated by hand and backfilled to prevent <br /> owl occupation. When feasible, other unoccupied burrows in ground disturbance <br /> area should also be excavated by hand and backfilled. Depending on the <br /> California red-legged frog and California tiger salamander Habitat Assessment <br /> results the project site may require a pre-construction survey for these species as <br /> well before burrows can be collapsed. <br /> Site(s) affected: Sites 18, 20 <br /> 4.0-1d: Compensatory mitigation for annual grassland habitat providing <br /> potentially suitable habitat for burrowing owl. Annual grasslands at Sites 18 and <br /> 20 may provide foraging, nesting, or wintering habitat for burrowing owl. If <br /> burrowing owls are found to be absent through the surveys prescribed above, <br /> then consistent with standard CDFG mitigations standards and ratios, annual <br /> grassland habitat at Sites 18 and 20 shall be compensated for at a ratio of 1:1. If <br /> burrowing owls are found to be occupying Sites 18 or 20, then compensatory <br /> mitigation shall be required at a ratio of 3:1, acres replaced to acres lost. The <br /> project applicant may fulfill this obligation by purchasing annual grassland <br /> property suitable for, or occupied by, burrowing owl. Such land shall be protected <br /> in perpetuity through an endowed conservation easement. Alternatively, the <br /> project applicant may purchase credits in an approved mitigation bank for <br /> burrowing owl. <br /> Site(s) affected: Sites 18, 20 <br /> (Draft SEIR, pp. 4.0-28 to 4.0-32; Final SEIR, p. 2-5.) <br /> Impact 4.0-2 <br /> Development facilitated by the General Plan Amendment and rezonings could <br /> potentially adversely affect wetlands, streams, or riparian habitat. <br /> The SEIR evaluates the impact of the proposed project on any riparian habitat or <br /> other sensitive natural community identified in local or regional plans, policies, or regulations by <br /> the California Department of Fish and Game or U.S. Fish and Wildlife Service. The proposed <br />