My WebLink
|
Help
|
About
|
Sign Out
06
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2012
>
011712
>
06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2012 11:37:51 AM
Creation date
1/13/2012 11:37:49 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
1/17/2012
DESTRUCT DATE
15Y
DOCUMENT NO
06
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Standard Conditions — Community Development Department <br /> 56. The project developer shall pay any and all fees to which the property may be subject to <br /> prior to issuance of permits. The type and amount of the fees shall be those in effect at <br /> the time the building permit is issued. <br /> 57. Dust and mud shall be contained within the boundaries of the property during times of <br /> construction. <br /> 58. No construction materials shall be stored within the public right-of-way. <br /> 59. The applicant is responsible for ensuring that no debris or construction scrap material is <br /> placed on any adjoining lot, open space area, or street, and that any such material <br /> stored on the site shall be completely removed and the site cleaned prior to occupancy. <br /> Urban Storm water Conditions <br /> 60. The project shall comply with the "Alameda Countywide NPDES Permit #CAS0029831 <br /> and amendments to this permit" issued the by California Regional Water Quality Control <br /> Board, San Francisco Bay Region, a copy of which is available at the Community <br /> Development Department, Public Works/Engineering section at City offices, Alameda <br /> County Clean Water Program and at State Water Board. <br /> (http://www.waterboards.ca.gov/sanfranciscobay/board info/agendas/2003/febr <br /> u a ry/02-19-03-12fi n a lto.d oc) <br /> and <br /> (http://www.waterboards.ca.gov/sanfranciscobav/board info/agendas/2007/mar <br /> ch/aameda%20fi nal%20order%20 r2-2007-0025.pdf) <br /> The project shall also comply with the "Construction General Permit" by the California <br /> Regional Water Quality Control Board, San Francisco Bay Region. <br /> (http://www.waterboards.ca.gov/water issues/proqrams/stormwater/constructio <br /> n.shtml) <br /> A. Design Requirements <br /> 1. The Permit design requirements include, but are not limited to, the following: <br /> a. Source control, sight design measures, and design and implementation of <br /> stormwater treatment measures are required when commercial, industrial <br /> or residential development creates and replaces 10,000 square feet or <br /> more of impervious surface, including roof area, streets, and sidewalk; and <br /> P11-709/P11-0717 205 Neal Street <br /> Draft Conditions of Approval 9 of 11 New Single-Family Home <br />
The URL can be used to link to this page
Your browser does not support the video tag.