My WebLink
|
Help
|
About
|
Sign Out
ORD 1040
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
1001 - 1100
>
ORD 1040
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2004 12:44:40 PM
Creation date
3/23/1999 3:53:14 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT NO
ORD 1040
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
89. That approval of the on-site water supply and distri- <br /> bution system be withheld pending final design <br /> and until the developer has demonstrated to the <br /> satisfaction of the City Engineer that the proposed <br /> system meets both the immediate and long range <br /> requirements for supplying water in this area. <br /> <br /> 90. ~hat the developer comply with any and all <br /> applicable requirements of the cross-connection <br /> control and backflow prevention device programs <br /> required by the California Administrative Code, <br /> Title 17. <br /> <br /> 91. That the developer pay the estimated applicable Zone 7 <br /> and City connection fees and the meter cost prior to <br /> Council approval of the development for any water <br /> meters (irrigation meters) not directly related <br /> to a building permit. <br /> <br /> 92. That a separate water'meter be provided to each <br /> lot of record within the development unless <br /> otherwise approved by the City Engineer. <br /> <br /> 93. That approval of the sanitary sewer system be with- <br /> held pending final design and until the developer <br /> has demonstrated to the satisfaction of the City <br /> Engineer that the proposed system is adequate, <br /> connects to an approved point of discharge, and <br /> meets both the immediate and long-range require- <br /> ments of the sanitary sewer system in this and all' <br /> tributary areas. <br /> <br />94. That a separate sanitary sewer lateral be provided <br /> to each lot of record within the development unless <br /> otherwise approved by the City Engineer. <br /> <br />95. That approval of the storm drainage system be with- <br /> held pending final design and until the developer <br /> has demonstrated to the satisfaction of the City <br /> Engineer that the system is adequate, connects to an <br /> approved point of discharge, meets any and all <br /> applicable requirements of the Alameda County Flood' <br /> Control District - Zone 7 meets any and all applicable <br /> requirements of the Federal Emergency Management Flood <br /> Hazard Program, and meets the immediate and long-range <br /> requirements of this development and all upstream <br /> areas intended to be drained through this tract. <br /> <br />96. That electric power distribution, gas distribution, <br /> communication service, and any required alarm systems <br /> be installed underground in a joint utility trench <br /> unless otherwise specifically approved by the City <br /> Engineer. <br /> <br /> 17 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.