My WebLink
|
Help
|
About
|
Sign Out
17
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2011
>
120611
>
17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2011 3:36:10 PM
Creation date
11/30/2011 3:36:09 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
12/6/2011
DESTRUCT DATE
15Y
DOCUMENT NO
17
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 3. Economic Analysis <br /> 3.1 Cost Estimates and Project Phasing <br /> Planning-level total capital costs (i.e. treatment and distribution facilities) will be developed for <br /> the scenarios. Using total capital costs and demands for each scenario, dollars-per-acre-foot <br /> ($/Ac-Ft) costs will be developed. Carollo will develop planning level estimates for operations <br /> and maintenance (O&M) and utilize these costs along with capital costs to develop life-cycle <br /> costs using industry standards. A recycled water pricing analysis will be conducted to determine <br /> the $/Ac-Ft using the present value of the capital and operations costs over the life cycle of the <br /> project in accordance with the guidelines of the SWRCB Planning Grant. <br /> Based on demand, facilities required, and annual cash requirements, Carollo will develop a <br /> phased implementation plan for incorporation into Pleasanton's overall capital improvement <br /> program (CIP). The City currently has a recycled water surcharge and Carollo will work with the <br /> City to incorporate this into the analysis. The implementation plan will identify necessary <br /> coordination with water suppliers to avoid duplication of service, determine required agreements <br /> or ordinances, and serve as a detailed schedule. <br /> 3.2 Funding Sources <br /> The objective of the funding task is to ensure the Feasibility Study presents a recycled water <br /> project that positions the City for maximum funding from State and Federal grant and loan <br /> programs. Carollo will lead two funding strategy meetings as described below. Final <br /> recommendations shall be included in the Feasibility Study. <br /> Funding Meeting No. 1 — Brainstorming Session: Carollo will prepare for and lead a <br /> brainstorming meeting to present the various funding programs and the criteria and priorities for <br /> those funding programs. The criteria and priorities may include project elements such as <br /> renewable energy, habitat protection, and watershed education. The brainstorming session, in <br /> concept, will identify project enhancements that could be considered as part of the Recycled <br /> Water Project that maximize the project benefits and funding competitiveness. <br /> Funding Meeting No. 2 — Project Enhancement Selection and Development: Carollo will develop <br /> and describe the high priority project enhancements. The descriptions will be developed to <br /> demonstrate consistency with the funding priorities. The project enhancement descriptions will <br /> be included in the feasibility study. Types of benefits, beneficiaries, and cost and degree of <br /> benefits shall be considered in the feasibility study. <br /> 3.3 Construction Financing Plan and Revenue Program <br /> In order to meet the requirements of the SWRCB planning grant, Carollo will develop a <br /> construction financing plan and revenue program for the recommended project. This task will <br /> comprise of identifying sources and timing of funds for design and construction using the <br /> information developed in Tasks 3.1 and 3.2. <br /> Carollo will develop a pricing policy for recycled water and provide an annual projection of water <br /> prices for each user category. In addition, Carollo will develop annual revenue requirements for <br /> the recycled water project and allocate these costs to water supply, water pollution control and <br /> recycled water users as appropriate. These allocations would be utilized to develop unit prices <br /> of recycled water for each user category. <br />
The URL can be used to link to this page
Your browser does not support the video tag.