My WebLink
|
Help
|
About
|
Sign Out
04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2011
>
120611
>
04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2011 4:03:13 PM
Creation date
11/30/2011 3:17:10 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
12/6/2011
DESTRUCT DATE
15Y
DOCUMENT NO
04
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE CITY OF 4 <br /> t° "' CITY COUNCIL AGENDA REPORT <br /> pL£ASANTONo <br /> December 6, 2011 <br /> Community Development <br /> Engineering Division <br /> TITLE: APPROVE PLANS AND SPECIFICATIONS, REVIEW BIDS, AND AWARD <br /> CONSTRUCTION CONTRACT TO AJW CONSTRUCTION IN THE <br /> AMOUNT OF $131,800 FOR THE ANNUAL SIDEWALK MAINTENANCE <br /> PROJECT, CIP NO. 105012 <br /> SUMMARY <br /> Bids have been received for the Annual Sidewalk Maintenance project, CIP No. 105012. <br /> Staff is recommending award of the construction contract to the lowest responsible <br /> bidder, AJW Construction in the amount of $131,800. This work will consist of removing <br /> and replacing existing concrete sidewalk, intersection ramps, and curb and gutter. <br /> Work will also include sidewalk replacement near Union Pacific Railroad crossings and <br /> accessibility to the Zone 7 pathway along West Las Positas Boulevard (see Attachment <br /> 1 for locations). <br /> RECOMMENDATION <br /> 1. Approve the plans and specifications for this project. <br /> 2. Review the bids received and award the construction contract for the project to <br /> AJW Construction of Oakland, California, in the amount of $131,800. <br /> 3. Authorize the City Manager to enter into the above construction contract. <br /> 4. Authorize the Director of Community Development to approve and execute <br /> contract change orders for a contingency amount not to exceed $26,360 (20% of <br /> the construction contract), for any necessary related subject project work. <br /> 5. Authorize the transfer of $8,000 from CIP No. 115043 — Bicycle and Pedestrian <br /> Related Improvements (Measure B funds) to CIP 105012 - Annual Sidewalk <br /> Maintenance to fund a portion of the improvements to the Zone 7 pathway along <br /> West Las Positas Boulevard. <br /> FINANCIAL STATEMENT <br /> Funding for this project will be provided by the Capital Improvement Program (CIP) <br /> through the Annual Sidewalk Maintenance project (CIP No. 105012) and the Bicycle <br /> and Pedestrian Related Improvements project (CIP 115043). <br />
The URL can be used to link to this page
Your browser does not support the video tag.