My WebLink
|
Help
|
About
|
Sign Out
ORD 1094
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
1001 - 1100
>
ORD 1094
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2004 1:03:10 PM
Creation date
3/22/1999 6:37:17 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT NO
ORD 1094
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
41. <br /> <br />42. <br /> <br />43. <br /> <br />44. <br /> <br />45. <br /> <br />46. <br /> <br />47. <br /> <br />48. <br /> <br />That a sanitary sewer sampling manhole be provided on the <br />sanitary sewer lateral, from the building unless otherwise <br />waived by the City Engineer. <br /> <br />That the developer comply with any and all applicable <br />rgquirements of the cross-connections control and back- <br />'flow prevention device programs required by the California <br />Administrative Code, Title 17, · <br /> <br />That all Pleasanton Fire Department requirements shall be <br />met. <br /> <br />That a second driveway be designed and constructed onto <br />Dublin Canyon Road at the north-west corner of the site <br />unless otherwise approved by the City Engineer. The <br />driveway shall be a right turn in-out only. U-turns <br />for southbound traffic would be feasible at the median <br />break for the Farmers Insurance Group project. <br /> <br />That all existing wells, septic tanks or holding tanks <br />on the site be properly sealed, filled and abandoned <br />prior to the start of grading operations unless Zone 7 <br />retains specific wells for observation wells, or special <br />approval is obtained from the City Engineer for temporary <br />use of an existing well for construction water. <br /> <br />That prior to issuance of a building permit, the developer <br />shall pay the applicable Zone 7 and City connection fees <br />and the meter cost for any water meters (irrigation meters) <br />not directly related to a building permit. <br /> <br />That approval for the n. umber, type and location of fire <br />hydrants be withheld pending final design, review by <br />the Fire Marshal, and final review by the City Engineer. <br /> <br />That approval of t. he storm drainage system be withheld <br />pending final design and until the developer has denDn- <br />strated to the satisfaction of the City Engineer th, at the <br />system is adequate, connects to an approved point of <br />discharge, meets any and all applicable requirements <br />of the Alameda County Flood Control District - Zone 7, <br />meets any and all applicable requirements of the Federal <br />Emergency ~anagement Flood Hazard Program and meets the <br />im~ediate and long-range requirements of this development <br />~nd all upstream areas in%ended ~o be drained through <br />this tract. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.