My WebLink
|
Help
|
About
|
Sign Out
11
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2011
>
081611
>
11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2011 11:38:16 AM
Creation date
8/10/2011 11:38:16 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
8/16/2011
DESTRUCT DATE
15Y
DOCUMENT NO
11
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DISCUSSION <br /> The Dolores Bengtson Aquatic Center Renovation Project includes separating and <br /> replacing the filtration and circulation systems of the existing diving, racing, and shallow <br /> pools; removal and replacement of the pool mechanical building; removal and <br /> replacement of the pool decks and drainage; storm water treatment for the renovated <br /> site; and preparation of landscape and irrigation plans for areas adjacent to the pools <br /> and site lighting improvements. The mechanical building will also include chemistry <br /> automation, energy conservation and system integration enhancements. <br /> Preliminary project costs are estimated at approximately $3.67 million. The City is <br /> planning to begin design process for the Dolores Bengtson Aquatic Center Renovation <br /> Project this fall, with construction proposed for early in 2012. <br /> Submitted by: Fiscal Review: Approved by: <br /> Susan Andrade-Wax Emily Wagner Nelson Fialho <br /> Director of Community Services Director of Finance City Manager <br /> Attachment: <br /> 1. Proposed Resolution <br /> Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.